Box Supplies Were Cycled

5 days 5 hours ago
Log Number: 4532961Logbook(s): Tags: Body: 

The following box supplies were CYCLED by version 2-16 of the Box Supply Cycling Script:
ARC1A Ramp Rate = 8.127 A/s
ARC3A Ramp Rate = 9.548 A/s
ARC5A Ramp Rate = 9.961 A/s
ARC7A Ramp Rate = 10.222 A/s
ARC9A Ramp Rate = 9.370 A/s
LAM1C Ramp Rate = 8.295 A/s
LAM3C Ramp Rate = 11.887 A/s
MYA2T01 Ramp Rate N/A
MYA4T01 Ramp Rate N/A
MYA6T01 Ramp Rate N/A
MYA8T01 Ramp Rate N/A
MYAAT01 Ramp Rate N/A
RSEP9A Ramp Rate = 9.252 A/s
XSEP2T Ramp Rate = 5.803 A/s
XSEP4T Ramp Rate = 5.311 A/s
XSEP6T Ramp Rate = 9.492 A/s
XSEP8T Ramp Rate = 17.786 A/s
XSEPAT Ramp Rate = 16.639 A/s

alexs

COMPLETED Investigate Shunt on MXE8R01

5 days 6 hours ago
Log Number: 4532956Logbook(s): Body: 

Shunt module was removed from slot. Sprayed shunt module and slot connections with contact cleaner. Checked dc output connections in the back of the chassis. All looked okay. Reinserted module. Turned supply back on. Turn over back to ops. We will keep an eye on this module to check for noise. If need be, we will change out module with a ready spare next opportunity. Associated PTW and IC has been surrendered.

banks, delk

banks

FSD Masking Tool: Successful System UN-Masking for: BeamLossMonitor

5 days 6 hours ago
Log Number: 4532954Logbook(s): Tags: Body: System UN-Masking for: BeamLossMonitor
User: bbarker
Areas: All

BeamLossMonitor Devices:
ILM0I07
ILM0L01A
ILM0L01B
ILM0L02
ILM2D00A
ILM2D00B
ILM0L04A
ILM0L04B
ILM0L05
ILM0L06A
ILM0L08
ILM0R01
ILM4D00
ILM0R03
ILM0R04
ILM0R06
ILM0R08
ILM0R09
ILM1L01
ILM1L02
ILM6R08
ILM3S00
ILM7S00
ILM9S00
ILM5S10
ILM5E03
ILM7S01
ILM9A01
ILM3E02
ILM5A01
ILM1A04
ILM1A06
ILM1A09
ILM5A10
ILM1A16
ILM1A19
ILM3R10
ILM9R07
ILM1R09
ILM2L03
ILM5R10
ILM5R05
ILM2L01
ILM2T09
ILM
bbarker

COMMENT ON Routine Maintenance of ODH Systems (Managed by SSG).

5 days 6 hours ago
Log Number: 4532953Logbook(s): Body: 

We need to replace the transmitter for OM01 in the injector service building (beside the restroom). The sensor is currently bypassed and we still have coverage in the area with other sensors. Tomorrow we will replace the transmitter with new replacement unit of same type and reroute the cables/conduit for a cleaner installation.

sbruhwel

Box Supplies Were Cycled

5 days 6 hours ago
Log Number: 4532952Logbook(s): Tags: Body: 

The following box supplies were CYCLED by version 2-16 of the Box Supply Cycling Script:
ARC2A Ramp Rate = 6.939 A/s
ARC4A Ramp Rate = 10.989 A/s
ARC6A Ramp Rate = 9.222 A/s
ARC8A Ramp Rate = 11.962 A/s
ARCAA Ramp Rate = 12.581 A/s
RSEP8A Ramp Rate = 10.612 A/s

alexs

FSD Masking Tool: Successful System Masking for: BeamLossMonitor

5 days 6 hours ago
Log Number: 4532951Logbook(s): Tags: Body: System Masking for: BeamLossMonitor
User: bbarker
Areas: All

BeamLossMonitor Devices:
ILM0I07
ILM0L01A
ILM0L01B
ILM0L02
ILM2D00A
ILM2D00B
ILM0L04A
ILM0L04B
ILM0L05
ILM0L06A
ILM0L08
ILM0R01
ILM4D00
ILM0R03
ILM0R04
ILM0R06
ILM0R08
ILM0R09
ILM1L01
ILM1L02
ILM6R08
ILM3S00
ILM7S00
ILM9S00
ILM5S10
ILM5E03
ILM7S01
ILM9A01
ILM3E02
ILM5A01
ILM1A04
ILM1A06
ILM1A09
ILM5A10
ILM1A16
ILM1A19
ILM3R10
ILM9R07
ILM1R09
ILM2L03
ILM5R10
ILM5R05
ILM2L01
ILM2T09
ILM8T0
bbarker

Autolog restore

5 days 6 hours ago
Log Number: 4532946Logbook(s): Tags: Body: saver ran from opsl01
Data from: /usr/opdata/burt/allsnap/07-28-26_10:40:01
Restored file: /tmp/07-28-26_14:27:01.snap


Setting Up Second Moller BS Setup: -11187.1V for VWien
bbarker

Autolog save

5 days 6 hours ago
Log Number: 4532944Logbook(s): Tags: Body: saver ran from opsl01

Saved: bbarker 07-28-26 14:26:47 {A:i B:1 C:5 E:1060 A=BS B=BS C=BS D=BS 0R08=0.00 0R08 dump in. Autosave prior to restore.
bbarker

iochc10 restored

5 days 6 hours ago
Log Number: 4532940Logbook(s): Tags: Body: restorelib 3.0.1 Target restore date was 2026-07-28 14:12:14 The output from the myRestore execution was as follows: iochc10 systemEnum@2026-07-28 14:12 2(2) restored Execute: /usr/csite/certified/bin/ced2Epics -ced ced -A -i iochc10 (success) PVs modified: 0 PVs modified: 0 PVs modified: 0 PVs modified: 0 PVs modified: 0 PVs modified: 0 PVs modified: 0 Procedure return status: Success
alarms

Shift Information

Shift Swing
CEBAF Program
MCC Crew Chief Forman
MCC Operators Schaumloffel, Yoon
Program Deputy Latosky