CEBAF Operations Summaries
Recent Log Entries
- Crew Chief Shift Log, 2026-08-13 DAY
- Crew Chief Timesheet Summary: 13 Aug 2026 DAY
- COMMENT ON Krest testing: Recompiled for RHEL7 and RHEL9
- BSList 112860: krest
- RF Module Downloads
- FSD Masking Tool: Successful System Masking for: CryoModule
- 2L11 dropped HV and Filaments; Cavity-5 watchdog fault
- Downtime Incident CREATED: 2L11 dropped HV and Filaments for Cavity 5 Watchdog Fault
- 2L11-5 RFCM lost comms
- rayTrace Data Collection: MBT0R08V to IDA1R02 - Y plane - BSList 120767 - ILD to 1R y-plane, 0.5mm, with beam this time.
- QuickPic - Hall C Full Survey
- rayTrace Data Collection: MBT0R08V to IDA1R02 - Y plane - BSList 120767 ILD to 1R y-plane, 0.5mm
- Summary of the transverse acceptance measurement beam study 120785
- rayTrace Data Collection: MAT0R08H to IDA1R02 - X plane - BSList 120767 - ILD to 1R x-plane 1mm
- COMPLETED Recover iocse17 SEE BPMs for Hall C










