Program Information

Recent Beam Current to Halls

recent beam current graph

Recent Log Entries

  • ATLis Comments Daily Digest
  • Gun krypton line charged up to 5 PSIG
  • COMMENT ON Trim Rack Blower Replacements in E1, E5, and W1 (SAM 2026)
  • ACG Report
  • COMPLETED 20 Amp Trim System Preventative Maintenance 2026
  • COMMENT ON 20 Amp Trim System Preventative Maintenance 2026
  • COMMENT ON CHL Control Room Network Infrastructure Relocation
  • Haimson magnets pre-installed
  • Follow-up Re: R30-6 retroreflection with mirror puck
  • COMMENT ON LNS Installation in W202B04
  • COMMENT ON LNS Installation in W202B04
  • COMMENT ON Vacuum Activities CEBAF 9/09/2026 through 12/31/26 (SAM26)
  • COMMENT ON CHL Control Room Network Infrastructure Relocation
  • COMMENT ON E3 to E5 Valve Interlock Cable repair/replacement (2026 SAM)
  • COMMENT ON Plasma processing during the Fall 2026 SAM
More

Shift Information

Shift Day
CEBAF Program
MCC Crew Chief Price
MCC Operators
Program Deputy Larrieu
Announcements

Access Status

Recent PSS History