Program Information
Recent Log Entries
- QuickPic - RSEP 8 at setpoint 1
- QuickPic - Arc 5 Box Supply at Setpoint 1
- Box Supplies Were Turned on at Setpoint 1
- Vacuum Group Summary 2026-07-01
- Operator SIGN IN
- Operator SIGN IN
- COMMENT ON SL LO/MO Rack Power Level Check
- COMMENT ON RF Maintenance June 30th, 2026
- CEBAF Update
- QuickPic - MBC7A25H mismatch, took setpoint and cycled
- MO LO GLDER PLDER Issue Update
- Crew Chief Shift Log, 2026-07-01 DAY
- Crew Chief Timesheet Summary: 01 Jul 2026 DAY
- "Faraday Cup #2 Is Now Locked In"
- The OPS DRVHs for the following cavities have been updated: 2L10-7











