Recent Log Entries
- COMMENT ON Migrate softIOCs from opsbat3
- COMMENT ON New Bunch-Length System Installation
- COMMENT ON Install/Connect Injector Girder 0L00 and Girder 0L01 Beamline to NEW Injector 1/4/Booster Cryomodule
- iocin1 restored
- COMMENT ON ZA dipoles return LCW water line replacement (7 magnets) - SAD 2023
- COMMENT ON Magnet warm region girder work - SAD 2023
- COMMENT ON Spring SAD 2023 RF Work Tracking
- COMMENT ON PSS system upgrade SAD 2023
- Laser stage measurement
- iocsoftin00srfvac restored
- COMMENT ON Spring SAD 2023 RF Work Tracking
- injector work summary 6/1/23
- COMMENT ON Modify 0L02 RF drive system for booster upgrade
- COMMENT ON Box Power Supply Preventative Maintenance and Interlock Checks Spring 2023
- NEG activations: 0I02, 0I04 and 0I05