Program Information
Recent Log Entries
- Supplemental pictures
- A Laser HCO completed
- COMMENT ON Plasma processing during the Fall 2026 SAM
- HV conditioning resistor tank is removed and R30-6 gun connected directly to the HVPS. Inspected all teh cables and receptacles, everything looks good.
- COMMENT ON CEBAF Gun High Voltage Conditioning with Kr Gas
- Operator SIGN IN
- Power Calculator doesn't like leading decimal points
- COMMENT ON SAM 2026 Box Supply Work Preventative Maintenance/interlock checks
- Follow-up Re: Cryogenics Update
- Cryogenics Update
- Hall C Daily Summary
- MOLLER Install 10/13/2026
- iocsoftw3spce restored
- COMMENT ON Vacuum Activities CEBAF 9/09/2026 through 12/31/26 (SAM26)
- COMMENT ON Vacuum Activities CEBAF 9/09/2026 through 12/31/26 (SAM26)