Recent Log Entries
- 2L25 LL vs turbo foreline pressure
- INJECTOR has been disabled in alarm handler
- INJECTOR has been enabled in alarm handler
- iocsoftinj9 restored
- COMMENT ON Switchover Hall A and C Beam Dump Cooling Water System Pumps to Backup Pumps
- COMMENT ON Troubleshoot B91 Tritium Tank Level Switch
- COMMENT ON B91 BDCW Pre & Post Filter Cartridge Replacement
- COMPLETED PSS to EPICS feedback correction
- COMPLETED PSS SL communication diagnostics and repair
- COMMENT ON Viewer SAM Maintenance
- APPROVED B45, B40 Meter Installation
- COMPLETED B73 73-ME2-H1 Meter Installation
- COMMENT ON B68, B56 Installation
- COMMENT ON B68, B56 Installation
- COMMENT ON Jumper out shunt resistor plates