Recent Log Entries
- COMMENT ON Magnet Disconnect for Electrical Testing of Arc Dipoles
- COMMENT ON Install C-100 style Vacuum Controls and Cable Install NL08 (2026 SAM)
- ced2Epics modified EPICS PVs
- COMMENT ON SAM26 PSS replace the ILD air cylinder actuator
- COMPLETED Extending Laser beam Passthrough of CEBAF Laser Room
- COMMENT ON Dominion Energy 40 and 33 MVA Substation PM
- COMMENT ON SL 1427 MHz Driveline Amplifier Work
- COMMENT ON Vacuum Activities CEBAF 9/09/2026 through 12/31/26 (SAM26)
- COMMENT ON RF 1L08 Upgrade network infrastructure installation
- COMMENT ON Install ZA Beam Pipe Restraint
- APPROVED Injector cable installation
- COMMENT ON SAM 2026 Box Supply Work Preventative Maintenance/interlock checks
- COMMENT ON Magnet Disconnect for Electrical Testing of Arc Dipoles
- 1L07 Cool Down Beginning
- CREW CHIEF SIGN IN