Aggregator
COMPLETED Install four 12A LNS in NL01B11
COMPLETED Replace MWF1I06 LNS with Spare
HYST AREA 7-0 Cycles Magnets
HYST AREA Version 7-0 has FAILED to cycle:
MBL0R01 -- NL01B11A -- softmag -- Failed to set after 2 cycle attempts
MBL0R02 -- NL01B11A -- softmag -- Failed to set after 2 cycle attempts
MBL0R03 -- NL01B11A -- softmag -- Failed to set after 2 cycle attempts
MBL0R04 -- NL01B11A -- softmag -- Failed to set after 2 cycle attempts
HYST AREA Version 7-0 has successfully cycled the following:
Area.Injector.PGun
Area.Injector.Linac
Area.Injector.Chicane
Total Time: 1.750 mins
HYST AREA 7-0 Cycles Magnets
HYST AREA 7-0 Cycles Magnets
Program Deputy Summary, presented 2026-02-03
Autolog restore
Operator SIGN IN
PCup to FC1 part 1
Started off struggling to get past A1 and A2 when first trying to send to FC1. Worked on a rough center through those to get to the next BPM. After that I was able to get beam centered through the pre buncher and MFX0I01 with no issue.
Centering through A1, A2 and the chopper was a challenge. I was able to center pretty well through A1 and A2, but putting the master slit in would block beam, so I was not centered though the chopper. I skipped ahead in the procedure to check centering through the solenoids near and in the chopper with the MS out.
QuickPic - NL Full survey - RF Only Ops
"North Linac: Restricted Access"
Autolog save
COMMENT ON Install four 12A LNS in NL01B11
COMMENT ON Disconnect magnets for girder removal
APPROVED B999 Replace defective exit light fixture
HYST AREA 7-0 Cycles Magnets
COMMENT ON YBBS06 Leak Repair
CREW CHIEF SIGN IN
THOMAS JEFFERSON NATIONAL ACCELERATOR FACILITY
ACCELERATOR OPERATIONS CREW CHIEF SIGN IN FORM
Date : 02-03-26
Time : 07:07:16
Day : Tuesday
Shift : Day
Crew Chief : Humphry
Program Deputy: Mock
Team : B
Arm : RadCon
Designated SSO: Janak
LERF Operator:
Operators : Janak
This stamp certifies that the above Crew Chief has read/reviewed/received the following:
The following cavity histories have been updated: Zone 1L16
The following cavity histories have been updated:
Zone 1L16
Username: deir
Date/Time: 02-03-26_06:59:40
RF Status: Good
Comment: CPS Blower Fan replacement completed 1/28
Special Instructions:
Maintenance Tag: Component: Operator Entry - See SME