cebaf drive lasers turned off
CCoC responded to site to assist CIS
ATLis Comments Daily Digest
Vacuum Group Summary 2025-12-23
CIS Work Summary 12/23/2025
MOLLER Install Update 12/23/2025
COMMENT ON MPS system general maintenance tasks for 2025 SAM
QuickPic - Accelerator Shutdown Checklist
MCC IS UNSTAFFED
THOMSAS JEFFERSON NATIONAL ACCELERATOR FACILITY
MACHINE CONTROL CENTER UNSTAFFED STAMP
Date : 12/23/2025
Time : 12:08
Crew Chief On-Call : Forman
Program Deputy : Forman
The MCC is unstaffed. The following satisfies AOD and LOD requirements to leave the control room unstaffed:
SSO Comments: Hall A under construction/PSS offline
Chiller beam data time scale
As Nick has correctly pointed out, the time range of the BPM data taken on 12/19/25 with chiller on vs. chiller off only contains enough data for one period of 120 Hz, not 60 Hz. I missed this during the measurement. As a result, one cannot tell if 60 Hz is present in the data or not; the visible component is 120 Hz. Sorry for the confusion.
This doesn't change the conclusion; however, should the magnetic field probe be insensitive to 120 Hz, it may not see the field.
Wien Chiller is Huge EM Source
Max's beam studies found EM noise on the beam around 1I02 region. When I did my last 60 Hz survey, it turns out the chiller was off.
Today, with Jay, we did search for 60 Hz noise. The chiller is huge source and by the beamline, the noise is still large - see photos 1-3.
The LO chiller in the Injector Service Building is much better, about two orders of magnitude smaller - see photo 4.