Aggregator

COMMENT ON Upgrade 2L03 to a C75 zone.

2 days 14 hours ago
Log Number: 4457133Logbook(s): Body: 

2L03 LLRF B12/B13/B14 work: Removed air plenums, 3 x X-connects in B14 and all cables connected to them (SSG removed their run-safe box cables for X connect removal.), power distribution chassis and started cutting out legacy 1.0 cables. Trashed the air plenums, RF crates and cabling in the new wire cages provided. Stored all power supplies in building 36 after tagging with zone and date. Brought interface chassis back to TEDF for spare cards and parts. L. Farrish installed MO/LO cables from the MO to the rack. All personal locks removed from MDP at end of day. Techs: C. Kerns, L. Farrish, A.

kerns

COMMENT ON Install four 12A LNS in NL01B11

2 days 14 hours ago
Log Number: 4457127Logbook(s): Body: 

Finished containing the spliced cable from the 4 channels in NL01B01 to Rack NL01B11. Cables have been labeled and stored in the cable trench. Cables have been terminated with the proper ends for the 12A LNS. We still need to install the Chassis and connect the chassis to power and the network.

- Kissinger

kmark

Cryo Daily Work Update

2 days 14 hours ago
Log Number: 4457126Logbook(s): Entry Makers: radovicBody: 

ESR valve box vacuum maintenance in progress
ESR2 adsorber o ring replaced and leak checked
ESR2 Main Compressor C4 mechanical maintenance in progress
North LINAC Zone 16 CAMAC to PLC upgrade in progress
ESR2 Instrumentation calibrations in progress

radovic

FML SAM 9/15 Updates

2 days 14 hours ago
Log Number: 4457125Logbook(s): Body: 

Projects:
o CUP Upgrade – Continuing piping fab/install. Electrical work to continue on Wednesday.
o N/S Access Cooling Upgrade – Insulating new ductwork in NAB.
o LERF – Installing guardrails on the backside at the cryomodule delivery bay. Expected to finish same day.

Maintenance:
o Continuing LCW Pump PMs - @ SAB, SL pumps completed Friday. Starting PMs @ EA LCW pumps Monday.
o Continuing SA Cooling Tower cleaning and PMs.
o Reminder: Hall A truck ramp electrical panel work planned for Tuesday (2-day power outage expected).

beason

Survey and Alignment work summary

2 days 15 hours ago
Log Number: 4457118Logbook(s): Body: 

12th September work:
- Hall D Target Cell as-found;
- Prepare for Hall A Moller Torus Magnet 4 coils alignment.

15th September work map:
- Hall A Moller Torus Magnet 4 coils alignment.
- (test lab) prepare for 0L0R line as-found.

balan

Chopper ion pump blip diagnosis

2 days 16 hours ago
Log Number: 4457109Logbook(s): Entry Makers: marcyBody: 

Turned off VIP0I04A (chopper 2) ion pump Wednesday. The blips since beam has been off are small and infrequent. Turning off VIP0I04A doesn't seem to have changed anything.

I'll turn off VIP0I03 (chopper 1) for the weekend with VIP0I04A back on and see how that reacts.

marcy

Vacuum Group Summary 2025-09-12

2 days 16 hours ago
Log Number: 4457105Logbook(s): Body: 

Injector
- VDP activation cart breakers fixed
- VDP0L06 activated successfully
- VDP0L03 scheduled for Monday morning

AE Line
- 3x beam pipes replaced
- VIPAE01, VIPAE01A, VIPAE02, VIPAT06, and VIPAT08A replaced
- Pump down started, will let work over weekend

duzik

Shift Information

Shift Swing
CEBAF Program Physics :D
MCC Crew Chief Merz
MCC Operators
Program Deputy RadCon
Announcements

Access Status

Recent PSS History

recent pss history graph