COMMENT ON YBBS04 & 06 Hose Repair/Replace
FSD Masking Tool: Successful System Masking for: BeamLossMonitor ***Some node's masks failed to write
HYST AREA 7-0 Cycles Magnets
HYST AREA 7-0 Cycles Magnets
Injector Alarm Limits Set
Autolog restore
Autolog save
"CW has been inhibited"
Operator SIGN IN
COMMENT ON CEBAF/Halls PSS Certification SAM25
Log Number: 4466467Logbook(s): Body:
On Wednesday SSG completed following tests:
Functional - Box Supplies ARC1, ARC6, XSEPT2, XSEPT4, BSY2C, BSY3C, TSB5C, LAM1C, LAM3C
Functional - Beam Stoppers
Functional - BCM (remaining tests are done together with Kicker Tests)
On Thursday the Injector, North Linac and South Linac will be swept starting at 11 am.
The focus will be on testing PSS RF Interfaces, with the possibility of testing any remaining Box Supplies, when ready.
ABIL tag #9310 on RF 1L10 has been removed
Gun HV Turned Off
Gun HV Rampdown Initiated
FSD Masking Tool: Successful Destination masking to: Inj500KeV ***Some node's masks failed to write
MCC UPS for PSS racks requires battery replacement
FML SAM Update
2L03 Cooldown Complete
MOLLER Install Update 01/14/2026
Log Number: 4466457Logbook(s): Tags: Entry Makers: jonesgaskelldwinesdougberdnikciprianBody:
Continued installation work of LCW MOLLER system, an continued installation work of Pion donut assembly. Hall A techs preparing for task of cutting target pivot flange, and de-installation of Cryo-transfer line from mirror can to target can.