Aggregator

Operator SIGN IN

2 days 18 hours ago
Log Number: 4466627Logbook(s): Body:  ACCELERATOR OPERATOR SIGN IN FORM OPERATOR:    Smith
DATE:             01/15/2026
SHIFT:               Owl

The operator has read the following:
  • ELOG
  • PD Shift Plan
  • Radiation Surveys for PSS Segments in Controlled Access
  • PSS Log
msmith

FML SAM Update 1/16/25

2 days 19 hours ago
Log Number: 4466626Logbook(s): Body: 

15th January work:

- Accelerator CHW HX placed back in service
- Started Tunnel Drip Pan Replacement where accessible
- Completed B91 LCW Calibrations. All annual Site LCW calibrations now complete
16th January work map:

- Hall C Junction Box - final cable terminations

- CUP Chiller Project ongoing
- Continuing Tunnel Drip Pan Replacements

cutler

iocsoftw3spce restored

2 days 21 hours ago
Log Number: 4466625Logbook(s): Tags: Body: restorelib 3.0.1 Target restore date was 2026-01-15 20:39:28 The output from the myRestore execution was as follows: iocsoftw3spce systemEnum@2026-01-15 20:39 2(2) restored Execute: /usr/csite/certified/bin/ced2Epics -ced ced -A -i iocsoftw3spce (success) PVs modified: 0 PVs modified: 0 PVs modified: 0 PVs modified: 0 PVs modified: 0 PVs modified: 0 PVs modified: 0 Procedure return status: Success
alarms

COMMENT ON CEBAF/Halls PSS Certification SAM25

2 days 23 hours ago
Log Number: 4466621Logbook(s): Body: 

Big kudos to Chris Kerns, who with his Safety Watch were the only RF techs assisting SSG with RF Certification. In my opinion it was too large of the task for two people, but they did great.

SSG does not anticipate preforming any PSS Certifications on Friday but there might be an opportunity if North and/or South Linacs are swept later in the afternoon. Otherwise, we will coordinate with RF and DC Groups suitable time for completing Certs of their equipment next week.

jkowal

COMMENT ON CEBAF/Halls PSS Certification SAM25

2 days 23 hours ago
Log Number: 4466619Logbook(s): Body: 

On Thursday 1/15/2026 SSG performed following PSS Certification tests:
Functional - Box Supplies ARC4, ARC8, DOG1, DOG6, DOG7
Functional - NL RF SSA, 0L02, 0L03, 0L04
Functional - NL RF 1L02, 1L03, 1L07, 1L08, 1L15, 1L16, 1L18, 1L19, 1L20, 1L21, 1L22, 1L23
Functional - SL RF 2L06, 2L07, 2L09, 2L11, 2L13, 2L15, 2L16, 2L19, 2L20, 2L21, 2L23, 2L24

jkowal

Operator SIGN IN

2 days 23 hours ago
Log Number: 4466618Logbook(s): Body:  ACCELERATOR OPERATOR SIGN IN FORM OPERATOR:    Anthony
DATE:             01/15/2026
SHIFT:               Swing

The operator has read the following:
  • ELOG
  • PD Shift Plan
  • Radiation Surveys for PSS Segments in Controlled Access
  • PSS Log
anthony

MOLLER Install Update 01/15/2026

3 days 1 hour ago
Log Number: 4466615Logbook(s): Tags: Entry Makers: jonesgaskelldwinesdougberdnikciprianBody: 

Continued installation work of LCW MOLLER system, an continued installation work, of Pion donut assembly. Hall A techs trained on driving new rental yard truck and trailer, that will be used to move MOLLER shielding blocks into hall for MOLLER power supply bunker build.

lhurt

Vacuum Group Summary 2026-01-15

3 days 1 hour ago
Log Number: 4466612Logbook(s): Body: 

ITV{8T09, AT09A}
- Line bled up and viewer removed
- Blanked off Tee, pumped down
- Leak check tomorrow morning

VIP2L13B
- Appendage ion pump installed
- Leak check passed
- Should be ready to open to beamline tomorrow
- Cleanroom removed

duzik

Shift Information

Shift Day
CEBAF Program
MCC Crew Chief Richardson
MCC Operators
Program Deputy Forman
Announcements

Access Status

Recent PSS History

recent pss history graph