Aggregator

HYST AREA 7-0 Cycles Magnets

3 days 2 hours ago
Log Number: 4510140Logbook(s): Body: 
HYST AREA Version 7-0 has FAILED to cycle:

MQRAR03 -- NA01B12 -- wa6mag -- Failed to set after 2 cycle attempts


HYST AREA Version 7-0 has successfully cycled the following:

Area.Linacs.North
Area.Linacs.South
Area.Arcs.Arc1.Spreader
Area.Arcs.Arc1.Arc
Area.Arcs.Arc1.Recombiner
Area.Arcs.Arc1.Extraction
Area.Arcs.Arc2.Spreader
Area.Arcs.Arc2.Arc
Area.Arcs.Arc2.Recombiner
Area.Arcs.Arc2.Extraction
Area.Arcs.Arc3.Spreader
Area.Arcs.Arc3.Arc
Area.Arcs.Arc3.Recombiner
yoon

Box Supplies Were Cycled

3 days 2 hours ago
Log Number: 4510139Logbook(s): Tags: Body: 

The following box supplies were CYCLED by version 2-16 of the Box Supply Cycling Script:
ARC1A Ramp Rate = 7.954 A/s
ARC2A Ramp Rate = 6.939 A/s
ARC3A Ramp Rate = 9.738 A/s
ARC4A Ramp Rate = 11.364 A/s
ARC5A Ramp Rate = 9.972 A/s
ARC6A Ramp Rate = 9.235 A/s
ARC7A Ramp Rate = 10.231 A/s
ARC8A Ramp Rate = 12.289 A/s
ARC9A Ramp Rate = 9.380 A/s
ARCAA Ramp Rate = 12.276 A/s
RSEP8A Ramp Rate = 10.612 A/s
RSEP9A Ramp Rate = 5.058 A/s

yoon

Box Supplies Were Cycled

3 days 2 hours ago
Log Number: 4510137Logbook(s): Tags: Body: 

The following box supplies were CYCLED by version 2-16 of the Box Supply Cycling Script:
ARC2A Ramp Rate = 6.939 A/s
ARC4A Ramp Rate = 11.008 A/s
ARC6A Ramp Rate = 9.235 A/s
ARC8A Ramp Rate = 11.974 A/s
ARCAA Ramp Rate = 12.276 A/s
RSEP8A Ramp Rate = 10.612 A/s

bschauml

ReCap restore completed successfully

3 days 2 hours ago
Log Number: 4510134Logbook(s): Body: 

ReCap ran from opsl01
Restore from: 2026-06-09 20:00:00
Comments: Restoring to Pre-2L Steering

Restore
46(46) restored

List of magnet PVs:
MDB0L06H.BDL MDJ0L07V.BDL MDB0L08H.BDL MDJ0L09V.BDL
MBT0R08V.BDL MBT1S09V.BDL MBT1S10H.BDL MBT1E01V.BDL
MBT1E02H.BDL MBT1A40V.BDL MQL1R02.BDL MBT1R02V.BDL
MBT1R04V.BDL MBT1R06H.BDL MBT1R07V.BDL MBT1R09H.BDL
MBT1R10H.BDL MBT1R10V.BDL MXJ1R04.BDL MAT2L02V.BDL
MAT2L04V.BDL MAT2L06V.BDL MAT2L07H.BDL MQB2L07.BDL
MAT2L08V.BDL MAT2L09H.BDL MAT2L10V.BDL MAT2L11H.BDL
MQB2L11.BDL MAT2L12V.BDL MAT2L13H.BDL MAT2L14V.BDL
MAT2L15H.BDL MAT2L16V.BDL MAT2L17H.

bschauml

SHIFT UPDATE: steering through SL

3 days 3 hours ago
Log Number: 4510132Logbook(s): Entry Makers: eformanBody: 

A little difficulty steering through the south. Noted the beam was a vertical stripe by the time we got to the 2L18 viewer. Grabbed the 1R V. betatron quads to round up the beam on the viewer.

eforman

Injector check done. Good setup ready for the rest to the machine

3 days 4 hours ago
Log Number: 4510130Logbook(s): Entry Makers: kazimiBody: 

Good injector setup to ILD. Good colinearity and ~99% transmission for 85uA C beam. Wien46.5 total. Good match. Ready for moving to North Linac. Save #27304 by kazimi

I checked the injector setup it is still very good. I did some improvement to colinearity of the beams and improved the transmission through A3 (Fig. 8). At the end we checked the match and it was also good (linked).
I think the beams are good for NL. We could improve the beam qualities by working on Lasers B and D tails. Figure 5 shows the tails for B and D in the chopper when Prebuncher is off, C is fine.

kazimi

Phaser Results

3 days 5 hours ago
Log Number: 4510122Logbook(s): Body: Results where Job # is 1011 {2} CAVITY PHASE ERROR (DEGREES) OUTCOME PHASE (DEGREES) START DATE DURATION (SECONDS) CORRECTION DATE CORRECTION ERROR REASON 1L18-8 0.81 CORRECTED 110.55 09-Jun-2026 20:08 57</
yoon

Phaser Results

3 days 5 hours ago
Log Number: 4510121Logbook(s): Body: Results where Job # is 1010 {13} CAVITY PHASE ERROR (DEGREES) OUTCOME PHASE (DEGREES) START DATE DURATION (SECONDS) CORRECTION DATE CORRECTION ERROR REASON 1L13-2 -1.30 CORRECTED -139.64 09-Jun-2026 20:05 5
yoon

Shift Information

Shift Owl
CEBAF Program
MCC Crew Chief Deir
MCC Operators Samari, Shriner
Program Deputy Minter
Announcements

Access Status

Recent PSS History

recent pss history graph