Crew Chief Shift Log, 2026-06-09 SWING
Start of shift: Injector beam studies, RF recovery in progress.
Start of shift: Injector beam studies, RF recovery in progress.
The following box supplies were CYCLED by version 2-16 of the Box Supply Cycling Script:
ARC1A Ramp Rate = 7.954 A/s
ARC2A Ramp Rate = 6.939 A/s
ARC3A Ramp Rate = 9.738 A/s
ARC4A Ramp Rate = 11.364 A/s
ARC5A Ramp Rate = 9.972 A/s
ARC6A Ramp Rate = 9.235 A/s
ARC7A Ramp Rate = 10.231 A/s
ARC8A Ramp Rate = 12.289 A/s
ARC9A Ramp Rate = 9.380 A/s
ARCAA Ramp Rate = 12.276 A/s
RSEP8A Ramp Rate = 10.612 A/s
RSEP9A Ramp Rate = 5.058 A/s
The following box supplies were CYCLED by version 2-16 of the Box Supply Cycling Script:
ARC2A Ramp Rate = 6.939 A/s
ARC4A Ramp Rate = 11.008 A/s
ARC6A Ramp Rate = 9.235 A/s
ARC8A Ramp Rate = 11.974 A/s
ARCAA Ramp Rate = 12.276 A/s
RSEP8A Ramp Rate = 10.612 A/s
ReCap ran from opsl01
Restore from: 2026-06-09 20:00:00
Comments: Restoring to Pre-2L Steering
Restore
46(46) restored
List of magnet PVs:
MDB0L06H.BDL MDJ0L07V.BDL MDB0L08H.BDL MDJ0L09V.BDL
MBT0R08V.BDL MBT1S09V.BDL MBT1S10H.BDL MBT1E01V.BDL
MBT1E02H.BDL MBT1A40V.BDL MQL1R02.BDL MBT1R02V.BDL
MBT1R04V.BDL MBT1R06H.BDL MBT1R07V.BDL MBT1R09H.BDL
MBT1R10H.BDL MBT1R10V.BDL MXJ1R04.BDL MAT2L02V.BDL
MAT2L04V.BDL MAT2L06V.BDL MAT2L07H.BDL MQB2L07.BDL
MAT2L08V.BDL MAT2L09H.BDL MAT2L10V.BDL MAT2L11H.BDL
MQB2L11.BDL MAT2L12V.BDL MAT2L13H.BDL MAT2L14V.BDL
MAT2L15H.BDL MAT2L16V.BDL MAT2L17H.
Good injector setup to ILD. Good colinearity and ~99% transmission for 85uA C beam. Wien46.5 total. Good match. Ready for moving to North Linac. Save #27304 by kazimi
I checked the injector setup it is still very good. I did some improvement to colinearity of the beams and improved the transmission through A3 (Fig. 8). At the end we checked the match and it was also good (linked).
I think the beams are good for NL. We could improve the beam qualities by working on Lasers B and D tails. Figure 5 shows the tails for B and D in the chopper when Prebuncher is off, C is fine.