Aggregator
Box Supplies Were Turned Off
The following box supplies were TURNED OFF by version 2-16 of the Box Supply Cycling Script:
ARC1A Ramp Rate = 8.126 A/s
ARC2A Ramp Rate = 7.364 A/s
ARC3A Ramp Rate = 10.507 A/s
ARC4A Ramp Rate = 11.347 A/s
ARC5A Ramp Rate = 10.693 A/s
ARC6A Ramp Rate = 9.556 A/s
ARC7A Ramp Rate = 10.490 A/s
ARC8A Ramp Rate = 12.281 A/s
ARC9A Ramp Rate = 10.091 A/s
ARCAA Ramp Rate = 12.963 A/s
DOG1E Ramp Rate = 3.846 A/s
DOG2E Ramp Rate N/A
DOG3E Ramp Rate N/A
DOG4E Ramp Rate N/A
DOG5E Ramp Rate N/A
DOG6E Ramp Rate N/A
DOG7E Ramp Rate N/A
DOG8E Ramp Rate N/A
DOG9E Ramp Rate N/A
RSEP8
Compilation of pre-maintanence day (4/23) beam measurements
QuickPic - Chopper RF off for Vacuum work
COMMENT ON BPM Maintenance
COMMENT ON Various tuner investigation and repair
All harpswipes completed with D beam
Program Deputy Summary, presented 2025-04-23
HarpFitter: IHAAE01 - Before maintanence day
HarpFitter: IHA8E01 - Before maintanence day
HarpFitter: IHA6E01 - Before maintanence day
COMMENT ON PM for BLDG 40 and 45
Operator In Training SIGN IN
HarpFitter: IHA4E01 - Before maintanence day
HarpFitter: IHA2E01 - Before Maintanence day
Operator SIGN IN
IMR1C12 - control cable reconnected
Reconnected the air solenoid control cable for IMR1C12.
Inserted the mirror from the Hall A Viewer Commander control screen. Verified the control channel is active. Verified the limit switch position change when the viewer is cycled IN/OUT.
Gp-PL-Gp
dogCalc V0-13 download
FSD Masking Tool: Successful System Masking for: BeamLossMonitor ***Some node's masks failed to write
User: mock
Areas: All
BeamLossMonitor Devices:
ILM0I07
ILM0L01A
ILM0L01B
ILM0L02
ILM2D00A
ILM2D00B
ILM0L04A
ILM0L04B
ILM0L05
ILM0L06A
ILM0L08
ILM0R01
ILM4D00
ILM0R03
ILM0R04
ILM0R06
ILM0R08
ILM0R09
ILM1L01
ILM1L02
ILM6R08
ILM3S00
ILM7S00
ILM9S00
ILM5S10
ILM5E03
ILM7S01
ILM9A01
ILM3E02
ILM5A01
ILM1A04
ILM1A06
ILM1A09
ILM5A10
ILM1A16
ILM1A19
ILM3R10
ILM9R07
ILM1R09
ILM2L03
ILM5R10
ILM5R05
ILM2L01
ILM2T09
ILM8T09<B