Aggregator

MOLLER Install Update 05/05/2026

3 days 13 hours ago
Log Number: 4495172Logbook(s): Tags: Entry Makers: jonesgaskelldwineskashydougberdnikciprianBody: 

Hall A techs continued removal of obstructions, from Blue utility platform. Techs continued expoxing anchors for equipment bases drilled earlier. Techs prepare tools, equipment and paperwork for removal of Cryo-transfer line and Mirror cans.

lhurt

COMMENT ON Repair INJ Chiller #1 53-CH-1

3 days 14 hours ago
Log Number: 4495149Logbook(s): Body: 

Control boards replaced and chiller is operation however additional testing is required before chiller will be released back into "auto" sequence. System temperature remains at setpoint with chiller #2 in operation.
Possible return to this task tomorrow afternoon. Task remains open.

msprouse

Operator SIGN IN

3 days 16 hours ago
Log Number: 4495098Logbook(s): Body:  ACCELERATOR OPERATOR SIGN IN FORM OPERATOR:    Shenenberger
DATE:             05/05/2026
SHIFT:               Swing

The operator has read the following:
alexs

Operator SIGN IN

3 days 16 hours ago
Log Number: 4495097Logbook(s): Body:  ACCELERATOR OPERATOR SIGN IN FORM OPERATOR:    Shriner
DATE:             05/05/2026
SHIFT:               Swing

The operator has read the following:
  • ELOG
  • PD Shift Plan
  • Radiation Surveys for PSS Segments in Controlled Access
  • PSS Log
shriner

Operator SIGN IN

3 days 16 hours ago
Log Number: 4495089Logbook(s): Body:  ACCELERATOR OPERATOR SIGN IN FORM OPERATOR:    Anthony
DATE:             05/05/2026
SHIFT:               Swing

The operator has read the following:
  • ELOG
  • PD Shift Plan
  • Radiation Surveys for PSS Segments in Controlled Access
  • PSS Log
anthony

Shift Information

Shift Day
CEBAF Program
MCC Crew Chief Humphry
MCC Operators Blackshaw, Janak
Program Deputy Drury
Announcements

Access Status

Recent PSS History

recent pss history graph