Aggregator
Crew Chief Timesheet Summary: 04 Aug 2026 OWL
Log Number: 4537512Logbook(s): Tags: Body:
Accelerator
PHYSICS
STUDIES
RESTORE
ACC
DOWN
OFF (SAM)
Planned
6
0
0
QuickPic - Arc9 JA Dipoles, NL side, Thermal Images
COMMENT ON FY 27 Pene. Emptying Requests
QuickPic - Arc5 JC Dipoles, SL side, Thermal Images
QuickPic - Arc5 JC Dipoles, NL side, Thermal Images
COMMENT ON BSY Hall A Line Matching Region Upgrade
COMMENT ON BSY Hall A Line Matching Region Upgrade
"Operators in SL for the FLIR pictures on dipoles"
LERF Operator Shift Log, 2026-08-03 DAY
Log Number: 4537501Logbook(s): Tags: Body:
LERF SHIFT LOG
Summary
Start of shift: Sorting out Cryo issues.
4K lines - too warm
LERF Operator Shift Log, 2026-08-03 SWING
Log Number: 4537500Logbook(s): Tags: Body:
LERF SHIFT LOG
Summary
Start of shift: Cavity 7 Gradient Checks
"Operators heading into NL for FLIR Pictures"
Box Supplies Were Turned Off
Log Number: 4537497Logbook(s): Tags: Body:
The following box supplies were TURNED OFF by version 2-16 of the Box Supply Cycling Script:
ARC1A Ramp Rate = 8.127 A/s
ARC2A Ramp Rate = 7.217 A/s
ARC3A Ramp Rate = 10.297 A/s
ARC4A Ramp Rate = 11.344 A/s
ARC5A Ramp Rate = 10.435 A/s
ARC6A Ramp Rate = 9.558 A/s
ARC7A Ramp Rate = 10.484 A/s
ARC8A Ramp Rate = 12.277 A/s
ARC9A Ramp Rate = 9.900 A/s
ARCAA Ramp Rate = 12.581 A/s
DOG1E Ramp Rate = 3.905 A/s
DOG2E Ramp Rate N/A
DOG3E Ramp Rate N/A
DOG4E Ramp Rate N/A
DOG5E Ramp Rate N/A
DOG6E Ramp Rate N/A
DOG7E Ramp Rate N/A
DOG8E Ramp Rate N/A
DOG9E Ramp Rate N/A
LAM1C










