Aggregator
New RTP HV Divers - OPS Archiver Signals
New RTP HV Drivers - Hall A Gateway Channel Access
For the old driver, we have - see linked entry:
"3. DACs of new RTP cell:
IGL0I00C1068_DAC05, IGL0I00C1068_DAC06, IGL0I00C1068_DAC07, IGL0I00C1068_DAC08, IGL0I00C1068_DAC09, IGL0I00C1068_DAC10, IGL0I00C1068_DAC11, IGL0I00C1068_DAC12."
We should keep these for the time being in case we need to go back to the old driver.
For the new drivers, we should add these PVs to the Hall A Gateway Channel Access:
RTPXPORT1Q1calc.A
RTPXPORT1Q4calc.A
RTPXPORT2Q1calc.A
RTPXPORT2Q4calc.A
RTPXPORT1Q2calc.A
RTPXPORT1Q3calc.A
RTPXPORT2Q2calc.A
RTPXPORT2Q3calc.A
Update "RTP Cell" Display on LASER SYSTEM OVERVIEW Screen
The display should show the status of the new two RTP HV Drivers ALARM bits, RTP1 ALARM and RTP2 ALARM: RTPXPORT1DRDBK, RTPXPORT2DRDBK.
Under "Screens", Hardware Controls: RTP Cell show open the "Injector->Parity->New RTP Driver" screen.
New RTP HV Driver - Alarm Handler
For the new RTP HV Drivers, we want to add these signals to the alarms. We want to keep in the alarms the old RTP Driver but have it disabled, in case we have to go back to the old one.
Under LASER-INJECTOR-POCKELS CELL, we should add both "RTP 1 HV DRIVER" and "RTP 2 HV DRIVER". The two signals are "RTPXPORT1DCTRL" and "RTPXPORT2DCTRL", "1" ON, "0" OFF.
We want also to add to the Alarm the eight HVs.
Injector Alarm Limits Set
FSD Masking Tool: Successful System UN-Masking for: BeamLossMonitor
Set up to FC2
We initially centered through the buncher, then proceeded to fine tune dechopping, while making sure that all beams time of arrival to the booster was equal.
We checked D Laser bucket and verified 750 MHz timing on IPM1I02.
Then we checked booster phasing, and found that the 7 cell was on crest while the 2 cell had been on phase then 35.5 degrees had been subtracted. We left it as we found it at the beginning of shift after scratching our heads for far too long trying to find out which cavity should be off crest.
Gun HV Turned Off
Autolog save
HarpFitter: IHA0L03
HYST AREA 7-0 Cycles Magnets for eDT
HYST AREA Version 7-0 has successfully cycled the following:
Magnets contained in the following file: /tmp/eDT_CMPQ_design_snapfile_0gh0jB.snap
MQJ0L01
MQJ0L02
MQJ0L02A
MDL0L02
MQJ0L03A
MQJ0L03
MQJ0L04
MQD0L06
MQB0L07
MQB0L08
MQB0L09
MQB0L10
Total Time: 1.283 mins