Aggregator
Vacuum Group Summary 2026-05-05
"BNR by Hall D for Diamond Reorientation"
Autolog save
CREW CHIEF SIGN IN
Log Number: 4495063Logbook(s): Body:
THOMAS JEFFERSON NATIONAL ACCELERATOR FACILITY
ACCELERATOR OPERATIONS CREW CHIEF SIGN IN FORM
Date : 05-05-26
Time : 15:33:23
Day : Tuesday
Shift : Swing
Crew Chief : Richardson
Program Deputy: Sereno
Team : X
Arm : Anthony
Designated SSO: Shriner
LERF Operator:
Operators : Anthony, Shenenberger, Shriner
This stamp certifies that the above Crew Chief has read/reviewed/received the following:
THOMAS JEFFERSON NATIONAL ACCELERATOR FACILITY
ACCELERATOR OPERATIONS CREW CHIEF SIGN IN FORM
Date : 05-05-26
Time : 15:33:23
Day : Tuesday
Shift : Swing
Crew Chief : Richardson
Program Deputy: Sereno
Team : X
Arm : Anthony
Designated SSO: Shriner
LERF Operator:
Operators : Anthony, Shenenberger, Shriner
This stamp certifies that the above Crew Chief has read/reviewed/received the following:
QuickPic - MBC7R06V mismatch, cycled
QuickPic - MDJ2L27V took setpoint
QuickPic - MQA9A24 mismatch, took setpoint and cycled
MQA9A24 Mismatch
QuickPic - Hall B Target Change: 3nA -> No Target
Crew Chief Shift Log, 2026-05-05 DAY
"Hall B -> 3nA"
Crew Chief Timesheet Summary: 05 May 2026 DAY
Log Number: 4495049Logbook(s): Tags: Body:
Accelerator
PHYSICS
STUDIES
RESTORE
ACC
DOWN
OFF (SAM)
Planned
8
0
0
Convergence for Hall D
Log Number: 4495027Logbook(s): Entry Makers: nissenBody:
We attempted to tweak the Hall D convergence using changes to the MQP5C10 quad strength while observing the beam profiler and pair spectrometer Fig 1. The tagged regions are where the quad changes were made, we measured 1%, 3% and 5% changes. No discernable change in the measured photon beam with those changes. To make sure we weren't on a node we ran harp scans, with the fitting showing a significant change in the beam profile. All changes were backed out and Hall D will use the beam as it was before beginning this convergence attempt.