Aggregator

iocse2 restored

3 days 1 hour ago
Log Number: 4537666Logbook(s): Tags: Body: restorelib 3.0.1 Target restore date was 2026-08-04 17:46:54 The output from the myRestore execution was as follows: iocse2 systemEnum@2026-08-04 17:46 2(2) restored seebpm@2026-08-04 17:46 2899(2899) restored Pause: 30 second(s) SEE_BURT 64(64) restored Execute: /usr/csite/certified/bin/ced2Epics -ced ced -A -i iocse2 (success) PVs modified: 0 PVs modified: 0 PVs modified: 0 PVs modified: 0 PVs modified: 0 PVs modified: 0 PVs modified: 0 Procedure return status: Success
alarms

HYST AREA 7-0 Cycles Magnets

3 days 1 hour ago
Log Number: 4537652Logbook(s): Body: 

HYST AREA Version 7-0 has successfully cycled the following:

Area.Linacs.North
Area.Linacs.South
Area.Arcs.Arc1.Spreader
Area.Arcs.Arc1.Arc
Area.Arcs.Arc1.Recombiner
Area.Arcs.Arc1.Extraction
Area.Arcs.Arc2.Spreader
Area.Arcs.Arc2.Arc
Area.Arcs.Arc2.Recombiner
Area.Arcs.Arc2.Extraction
Area.Arcs.Arc3.Spreader
Area.Arcs.Arc3.Arc
Area.Arcs.Arc3.Recombiner
Area.Arcs.Arc3.Extraction
Area.Arcs.Arc4.Spreader
Area.Arcs.Arc4.Arc
Area.Arcs.Arc4.Recombiner
Area.Arcs.Arc4.Extraction
yoon

1L04 Arc Detector

3 days 6 hours ago
Log Number: 4537622Logbook(s): Entry Makers: janakBody: 

One of the arc detectors on 1L04 was knocked off when it got snagged on equipment being transported out of the tunnel. RF has been notified and they are in the process of investigating and reattaching it.

janak

COMMENT ON BCM System - maintenance and repairs

3 days 7 hours ago
Log Number: 4537618Logbook(s): Body: 

checked IPMAD00 and found equipment to be working as intended. It was discovered the nearby hvac unit is blowing cold air directly on the cavity. Talking with others we believe there was a deflector hood on it at one point. Recommending one be added due to the fact the heating circuit is unresponsive on the HVAC unit.

sawyer

CIS: scoping SAM laser enclosure modification

3 days 7 hours ago
Log Number: 4537615Logbook(s): Entry Makers: gramesBody: 

Dave Fazenbaker, Gary Hays and I visited the injector and were escorted in the laser room to scope two jobs for the SAM, a) cutting a new penetration for a cable pull into the laser room and b) extending the existing laser room exit aperture to locate the steering lens nearer the vacuum window. Both jobs are to prepare for MOLLER.

Finally, Dave and Gary collected useful information, thank you.

grames

Machine Update

3 days 7 hours ago
Log Number: 4537608Logbook(s): Entry Makers: janakBody: 

Beam scan and spot move completed
Setting up for Injector checks to FC2
Hall B being swept
Arc 5 & 9 magnets being flushed

janak

Shift Information

Shift Swing
CEBAF Program
MCC Crew Chief Richardson
MCC Operators Merz, Schaumloffel, Yoon
Program Deputy Latosky
Announcements

Access Status

Recent PSS History

recent pss history graph