Aggregator

iocea6 restoration failed

6 days 12 hours ago
Log Number: 4465282Logbook(s): Tags: Body: restorelib 3.0.1 Target restore date was 2025-12-04 08:48:37 The output from the myRestore execution was as follows: iocea6 Execute: /cs/opshome/scripts/60_second_wait.sh (success) Please wait 60 seconds for restore... Pause: 60 second(s) Execute: /cs/opshome/scripts/scan_gain_set.sh (success) Old : IPMBSCN Normal New : IPMBSCN Calib Old : IPMBSCN Calib New : IPMBSCN Normal Old : IPMBGMD Auto New : IPMBGMD
alarms

Operator SIGN IN

6 days 12 hours ago
Log Number: 4465281Logbook(s): Body:  ACCELERATOR OPERATOR SIGN IN FORM OPERATOR:    Samari
DATE:             01/08/2026
SHIFT:               Day

The operator has read the following:
  • ELOG
  • PD Shift Plan
  • Radiation Surveys for PSS Segments in Controlled Access
  • PSS Log
samari

Operator SIGN IN

6 days 13 hours ago
Log Number: 4465277Logbook(s): Body:  ACCELERATOR OPERATOR SIGN IN FORM OPERATOR:    Janak
DATE:             01/08/2026
SHIFT:               Day

The operator has read the following:
  • ELOG
  • PD Shift Plan
  • Radiation Surveys for PSS Segments in Controlled Access
  • PSS Log
janak

COMPLETED 1L09 Heater control investigation

6 days 13 hours ago
Log Number: 4465273Logbook(s): Body: 

consider complete. no activity has happened since November as paperwork was left open to facilitate the need for repairs should it occur. RF and I&C investigated their respective portions and in the end nothing "smoking" was found.

sawyer

FML SAM Update 1/08

6 days 23 hours ago
Log Number: 4465270Logbook(s): Body: 

Maintenance:
- Troubleshoot B38 Cooling tower Bypass Valve Actuator
- B70 Disconnect 120V power to Fire Alarm Nitrogen Generator
Projects:
- Hall C Junction Box: Conduit & Junction box rough-in ongoing.
- CUP Chiller Project ongoing

cutler

Shift Information

Shift Day
CEBAF Program
MCC Crew Chief Richardson
MCC Operators
Program Deputy Forman
Announcements

Access Status

Recent PSS History

recent pss history graph