Log Number: 4287649Logbook(s): Entry Makers: deirBody: 

Steered up hall C line, took some harp swipes. Hall was happy with the swipes and wanted to move on to production, but we first had to do ion chamber functionality test and an ion chamber calibration.

Tried to look at beam on the ITV3H10 viewer, but it seems to not be working. This could be an issue when doing the NPS setup procedure.

Moving on to ion chamber calibrations.

deir

Update

3 days 6 hours ago
Log Number: 4287643Logbook(s): Entry Makers: lawBody: 

Had an issue with iocin3 communication. Checked CED to see what ws on the ioc. Some critical stuff was on the ioc, fsd signals, gun on/off state, and others. Checked the gun on/off state, fsd signals, etc and seemed like we were communicating . Wanted to verify that I could believe the signals I'm observing. Notified SW on call and his CAMAC diagnostics showed that we were indeed communicating with the signals. I'm ok with that. We are continuing with Hall set up: Hall A and C harp scans. For Hall C we are performing the ion chamber functionality test.

law

iocin3 showing up as not communicating via Alarm Handler

3 days 6 hours ago
Log Number: 4287641Logbook(s): Entry Makers: dchriBody: 

Overall Restore not needed. Alarm handler Just needed to be "forced" to see the IOC

iocin3 showing up as not communicating via Alarm Handler.
iocin3 showing up as communicating via iocin3 EDM screen

Was going to restore ioc and then had seen "PSS CRITICAL" on the ioc's EDM screen. Contacted software on call to assure a restore would be okay.

(Fig. 1)
Ioc's EMD screen (PSS CRITICAL)

(Fig. 2)
Alarm handler not showing ioc as communicating

(Fig. 3)
CED shows many elements on this IOC (but does not mention injector gun)

(Fig.

dchri

Hall A Harp scan comparison 1H04A/B

3 days 6 hours ago
Log Number: 4287638Logbook(s): Entry Makers: dchriBody: 

Harp scans on 1H04A/B look comparable to those taken on April 20th. Sigma x a bit off in 1H04A but overall looks okay

(Fig. 1)
Shows Harp scans 1H04B from April 20th

(Fig. 2)
Shows Harp scans 1H04B from Today

(Fig. 3)
Shows Harp scans 1H04A from April 20th

(Fig. 4)
Shows Harp scans 1H04A from Today

dchri

Software On-Call

3 days 6 hours ago
Log Number: 4287635Logbook(s): Body: 

Called for alarms on iocin3 CAMAC. Found that the IOC was up and running and that CAMAC looked good. Checked
the camac verifier card for iocin3 and ran camac_io_report(2) on iocin3 and all returned good status.
Checked the High Voltage Controls and all looked good. The gun was up at 140 KV and reading back properly.
Forced processing on the 4 CAMAC EPICS PVs which cleared the Alarms.

higgins

FSD Masking Tool: Successful System UN-Masking for: BeamLossMonitor

3 days 6 hours ago
Log Number: 4287634Logbook(s): Tags: Body: System UN-Masking for: BeamLossMonitor
User: deir
Areas: All

BeamLossMonitor Devices:
ILM0I07
ILM0L01A
ILM0L01B
ILM0L02
ILM2D00A
ILM2D00B
ILM0L04A
ILM0L04B
ILM0L05
ILM0L06A
ILM0L08
ILM0R01
ILM4D00
ILM0R03
ILM0R04
ILM0R06
ILM0R08
ILM0R09
ILM1L01
ILM1L02
ILM6R08
ILM3S00
ILM7S00
ILM9S00
ILM5S10
ILM5E03
ILM7S01
ILM9A01
ILM3E02
ILM5A01
ILM1A04
ILM1A06
ILM1A09
ILM5A10
ILM1A16
ILM1A19
ILM3R10
ILM9R07
ILM1R09
ILM2L03
ILM5R10
ILM5R05
ILM2L01
ILM2T09
ILM8T0
deir

Shift Information

Shift Day
CEBAF Program
MCC Crew Chief Price
MCC Operators Schaumloffel, Chaudhary
Program Deputy Ruiz
Announcements Beam to A, B, and C

Access Status

Recent PSS History

recent pss history graph