Autolog save
"2 Hour escalation notifications made."
HYST AREA 7-0 Cycles Magnets
HYST AREA Version 7-0 has successfully cycled the following:
Area.Linacs.North
Area.Linacs.South
Area.Arcs.Arc1.Spreader
Area.Arcs.Arc1.Arc
Area.Arcs.Arc1.Recombiner
Area.Arcs.Arc1.Extraction
Area.Arcs.Arc2.Spreader
Area.Arcs.Arc2.Arc
Area.Arcs.Arc2.Recombiner
Area.Arcs.Arc2.Extraction
Area.Arcs.Arc3.Spreader
Area.Arcs.Arc3.Arc
Area.Arcs.Arc3.Recombiner
Area.Arcs.Arc3.Extraction
Area.Arcs.Arc4.Spreader
Area.Arcs.Arc4.Arc
Area.Arcs.Arc4.Recombiner
Area.Arcs.Arc4.Extraction
More re-steering
Should be at the hall dumplets now with a reasonably clean orbit up to the AT and BS lines. 3R10 BLM is still noisy and showing spikes with beam, the origin of which remains unknown.
I went odd dumplet by odd dumplet and left all but the energy locks off for this round of steering to try and track down where the loss was coming from. Unfortunately it's somewhat inconclusive, though it does seem to be more likely that the upper passes are contributing the most, i.e., I think we're clipping an aperture somewhere around/above 7R. Don't rule out some lower pass orbit that I missed...
HYST AREA 7-0 Cycles Magnets
HYST AREA Version 7-0 has successfully cycled the following:
Area.Linacs.North
Area.Linacs.South
Area.Arcs.Arc1.Spreader
Area.Arcs.Arc1.Arc
Area.Arcs.Arc1.Recombiner
Area.Arcs.Arc1.Extraction
Area.Arcs.Arc2.Spreader
Area.Arcs.Arc2.Arc
Area.Arcs.Arc2.Recombiner
Area.Arcs.Arc2.Extraction
Area.Arcs.Arc3.Spreader
Area.Arcs.Arc3.Arc
Area.Arcs.Arc3.Recombiner
Area.Arcs.Arc3.Extraction
Area.Arcs.Arc4.Spreader
Area.Arcs.Arc4.Arc
Area.Arcs.Arc4.Recombiner
Area.Arcs.Arc4.Extraction
Unable to log into opslfb1
Operator SIGN IN
Program Deputy Summary, presented 2026-08-05
Operator SIGN IN
COMPLETED N. Access Detectors Calibration (RM05)
COMPLETED Further Investigate Shunt on MXE8R01
CREW CHIEF SIGN IN
THOMAS JEFFERSON NATIONAL ACCELERATOR FACILITY
ACCELERATOR OPERATIONS CREW CHIEF SIGN IN FORM
Date : 08-05-26
Time : 07:31:03
Day : Wednesday
Shift : Day
Crew Chief : Blackshaw
Program Deputy: Latosky
Team : E
Arm : RadCon
Designated SSO: Janak
LERF Operator:
Operators : Humphry, Janak
This stamp certifies that the above Crew Chief has read/reviewed/received the following:
Even Orbit lock cause loss in 5R (seen as 3R10 BLM loss?)
seems like beam ramp up to 70uA was (initially) reasonably fine, until even orbit lock (Arc 4) was tuned on. Soon after, the parade of 3R10 BLM trips led us to hunting for solutions.
Possibly ReCap restore (prior to even orbit locks turning on) may help... Also maintenance day begins in 30min...
\_(o_o)_/
COMMENT ON Hall C End Station Dump O2 Spikes Assessment
We made an access to check the p-trap and tygon hoses in building 95. No signs of anything obvious that would contribute to the O2 reading we are experiencing in the vent stack. There was no access to the hall C dump alcove due to time and current activation, but an access at first opportunity is recommended as an inspection.
Observation:
nothing out of place in building 95
New BPM (?) in the hall C alcove.
We will continue to monitor and troubleshoot the intermittent O2 spikes.
Crew Chief Shift Log, 2026-08-05 OWL
Start of shift: CW to B and D. Hall C taking Harp swipes.
Crew Chief Shift Log, 2026-08-04 DAY
Start of shift: Beam off for maintenance day.