"Hall B Beam Off for Target Configuration Change"
CREW CHIEF SIGN IN
THOMAS JEFFERSON NATIONAL ACCELERATOR FACILITY
ACCELERATOR OPERATIONS CREW CHIEF SIGN IN FORM
Date : 04-24-24
Time : 15:12:31
Day : Wednesday
Shift : Swing
Crew Chief : Freeman
Program Deputy: Gal
Team : E
Arm : Anthony
Designated SSO: Yoon
LERF Operator:
Operators : Anthony, Yoon
This stamp certifies that the above Crew Chief has read/reviewed/received the following:
Crew Chief Shift Log, 2024-04-24 DAY
Start of shift: Beam to A, B, and C.
Crew Chief Timesheet Summary: 24 Apr 2024 DAY
beam loss in machine
IIX6E02 peaking at several hundred rad/hr, figure 3. NDX7A15 and 8A15 normally see nothing but that's not the case since 0700 this morning, figure 2. IIX8E02 higher than it should be, but tolerable, figure 1. BLA loss signal high even though calibration was done around 1000, bottom panel of figures 1 and 3.
The OPS DRVHs for the following cavities have been updated: 1L13-8
Follow-up Re: QuickPic - Cannot reset Injector alarm limits
1L22 BL VAC Fault
Injector Alarm Limits Set
Program Deputy Weekly Summary, presented 2024-04-24
- PROGRAM DEPUTY: Ciprian Gal
QuickPic - 1L13-8 OLT, Derated 0.3 MV/m
Downtime Incident CLOSED: 1L13-8 OLT
Downtime Incident CREATED: 1L13-8 OLT
Autolog save
Autolog save
Downtime Incident CLOSED: Injector Checks
Injector check for transmission
PID, orbit, and energy locks OFF
Current transmission for as-found machine set up
----------
C laser
Fig. 1 PCup (Gun uA (IGL1I00POTcurrent) agrees with PCup)
Fig. 2 FC2 (Gun uA plus losses agrees with FC2)
Fig. 3 C orbit to ILD
Fig. 4 Zero-pos with C
----------
A laser
Fig. 5 PCup
Fig. 6 FC2
Fig. 7 A orbit relative to C
----------
B laser
Open B Slit
Fig. 8 PCup
Fi.g 9 FC2
Fig. 10 B orbit relative to C
B slit at operational setting 17.9
Fig. 11 PCup
Fig. 12 FC2
After looking at chopper setup, we re-took data to see if chopper setup changes can improve transmission.
Fig. 13 C to FC2
Fig.