Aggregator
iocsl13diag restored
COMMENT ON Routine Maintenance of ODH Systems (Managed by SSG).
iocin1mag restored
COMMENT ON Helicity Crate replacement I&C work (SAM 2025-2026)
COMMENT ON PSS display wall monitor replacement
COMMENT ON Site Cooling Tower PMs
iocin1b restored
COMPLETED PSS maintenance and troubleshooting 2025 run
COMMENT ON 20 Amp Trim System Preventative Maintenance 2025
COMMENT ON Building 53-Laser Room Access Control Addition
Panel outage (tentatively) scheduled for Thursday 9-11-25. Carr Electric will be on-site to perform LOTO and connect the equipment. If possible, we would like to begin 730-800am. Still waiting on confirmation from low voltage sub on the card reader installation.
iocsoftinjvac3 restoration failed
iocsoftinjvac2 restoration failed
iocsoftIDXE401 restored
iocsoftIDXE401 restored
COMMENT ON Install 8 kW circulators in 2L05 and test into shorts
COMMENT ON Install 8 kW circulators in 2L05 and test into shorts
Test performance from Rama,
FCC mode should be in tone mode
GLOS controls the drive to the klystron (GDCL limits the drive)
the readbacks we should be looking at are CRFP, CRRP and KRRPw
CRFP (forward power measured at the waveguide coupler in kW)
CRRP (reflected power measured at the waveguide coupler in kW)
KRRPw (klystron reflected power measured in watts)
CRFP and CRRP are measured by FCC and KRRPw is measured by HPA controller
The procedure should be start with a GLOS of 0 and slowly increment until we see some power.