Log Number: 4465277Logbook(s): Body:  ACCELERATOR OPERATOR SIGN IN FORM OPERATOR:    Janak
DATE:             01/08/2026
SHIFT:               Day

The operator has read the following:
  • ELOG
  • PD Shift Plan
  • Radiation Surveys for PSS Segments in Controlled Access
  • PSS Log
janak

COMPLETED 1L09 Heater control investigation

3 days 19 hours ago
Log Number: 4465273Logbook(s): Body: 

consider complete. no activity has happened since November as paperwork was left open to facilitate the need for repairs should it occur. RF and I&C investigated their respective portions and in the end nothing "smoking" was found.

sawyer

FML SAM Update 1/08

4 days 5 hours ago
Log Number: 4465270Logbook(s): Body: 

Maintenance:
- Troubleshoot B38 Cooling tower Bypass Valve Actuator
- B70 Disconnect 120V power to Fire Alarm Nitrogen Generator
Projects:
- Hall C Junction Box: Conduit & Junction box rough-in ongoing.
- CUP Chiller Project ongoing

cutler

MOLLER Install Update 01/07/2026

4 days 7 hours ago
Log Number: 4465265Logbook(s): Tags: Entry Makers: jonesgaskelldwinesdougberdnikciprianBody: 

Continued installation of MOLLER LCW system. Hall D continued assembly of the pion donut assembly. Hall A techs moved transport structure for seven-sided ring to laydown yard and dis-assembled.

lhurt

iocsoftihvbs1 restored

4 days 10 hours ago
Log Number: 4465257Logbook(s): Tags: Body: restorelib 3.0.1 Target restore date was 2026-01-07 16:06:45 The output from the myRestore execution was as follows: iocsoftihvbs1 systemEnum@2026-01-07 16:06 2(2) restored Execute: /usr/csite/certified/bin/ced2Epics -ced ced -A -i iocsoftihvbs1 (success) PVs modified: 0 PVs modified: 0 PVs modified: 0 PVs modified: 0 PVs modified: 0 PVs modified: 0 PVs modified: 0 Procedure return status: Success
alarms

COMMENT ON Injector CAMAC Card cleanup

4 days 11 hours ago
Log Number: 4465253Logbook(s): Body: 

Unseated several cards, and had SSG remove their unused CAMAC node card. I will attach a spreadsheet of cards removed in the next comment. Will leave paperwork open until next monday such that should any hardware need to be reseated, we can do so expeditiously

sawyer

COMMENT ON B63 Repair/replace lighting.

4 days 12 hours ago
Log Number: 4465236Logbook(s): Body: 

Electricians will link a new PTW to replace the defective breaker for the E4 lighting circuit in Panel 63-E4-L. Please note that shutting down Panel 63-E4-L will also de-energize Panel 63-E4-PP1. Refer to the attached panel schedules for details. Once we receive clearance to shut down the panels, we are prepared to proceed immediately.

dunlap

iocse9 restored

4 days 12 hours ago
Log Number: 4465231Logbook(s): Tags: Body: restorelib 3.0.1 Target restore date was 2026-01-07 14:38:32 The output from the myRestore execution was as follows: iocse9 systemEnum@2026-01-07 14:38 2(2) restored seebpm@2026-01-07 14:38 369(369) restored fastfb@2026-01-07 14:38 44(44) restored Pause: 30 second(s) SEE_BURT 9(9) restored Execute: /usr/csite/certified/bin/ced2Epics -ced ced -A -i iocse9 (success) PVs modified: 0 PVs modified: 0 PVs modified: 0 PVs modified: 0 PVs modified: 0 PVs modified: 0 PVs modified: 0 Procedure return status: Success
alarms

iocse14 restored

4 days 12 hours ago
Log Number: 4465229Logbook(s): Tags: Body: restorelib 3.0.1 Target restore date was 2026-01-07 09:46:57 The output from the myRestore execution was as follows: iocse14 systemEnum@2026-01-07 09:46 2(2) restored seebpm@2026-01-07 09:46 369(369) restored fastfb@2026-01-07 09:46 44(44) restored Pause: 30 second(s) SEE_BURT 9(9) restored Execute: /usr/csite/certified/bin/ced2Epics -ced ced -A -i iocse14 (success) PVs modified: 0 PVs modified: 0 PVs modified: 0 PVs modified: 0 PVs modified: 0 PVs modified: 0 PVs modified: 0 Procedure return status: Success </pre
alarms