Aggregator

Pass 1 Separation Check

1 day 20 hours ago
Log Number: 4522415Logbook(s): Entry Makers: bschaumlBody: 

Found beams shifted slightly to the left of the wires on the 2E02 viewer and C/D beams not collinear. Steered them onto the wires and nudged phase up 2 degrees to place C/D on top of each other with a vernier increase of 0.05 to get them spread out again. Checking on the BPMs revealed that there is a discrepancy between them and the viewer, so we nudged the vernier back down a smidge to get separation right on the money. Correcting to the BPMs also put 2S10H pretty much back where day shift left it.

bschauml

OMSL19 and OMSL20 dipping into alarm range

1 day 20 hours ago
Log Number: 4522412Logbook(s): Entry Makers: lrichardBody: 

Paged SSG as they are two adjacent heads. Heads probably responding to water from magnet leak and heat. Talk to SSG and they may want to go down to investigate. Hoping only a re-calibration is needed since we just got the machine back up.

lrichard

HYST AREA 7-0 Cycles Magnets

1 day 20 hours ago
Log Number: 4522409Logbook(s): Body: 
HYST AREA Version 7-0 has FAILED to cycle:

MQD1L02 -- NL01B01 -- nl6mag -- Failed to set after 2 cycle attempts


HYST AREA Version 7-0 has successfully cycled the following:

Area.Linacs.North
Area.Linacs.South
Area.Arcs.Arc1.Spreader
Area.Arcs.Arc1.Arc
Area.Arcs.Arc1.Recombiner
Area.Arcs.Arc1.Extraction
Area.Arcs.Arc2.Spreader
Area.Arcs.Arc2.Arc
Area.Arcs.Arc2.Recombiner
Area.Arcs.Arc2.Extraction
Area.Arcs.Arc3.Spreader
Area.Arcs.Arc3.Arc
Area.Arcs.Arc3.Recombiner
bschauml

Box Supplies Were Cycled

1 day 21 hours ago
Log Number: 4522407Logbook(s): Tags: Body: 

The following box supplies were CYCLED by version 2-16 of the Box Supply Cycling Script:
ARC1A Ramp Rate = 7.954 A/s
ARC2A Ramp Rate = 6.939 A/s
ARC3A Ramp Rate = 9.548 A/s
ARC4A Ramp Rate = 10.989 A/s
ARC5A Ramp Rate = 10.192 A/s
ARC6A Ramp Rate = 9.222 A/s
ARC7A Ramp Rate = 9.973 A/s
ARC8A Ramp Rate = 11.962 A/s
ARC9A Ramp Rate = 9.370 A/s
ARCAA Ramp Rate = 12.234 A/s
MYA2T01 Ramp Rate N/A
MYA4T01 Ramp Rate N/A
MYA6T01 Ramp Rate N/A
MYA8T01 Ramp Rate N/A
MYAAT01 Ramp Rate N/A
RSEP8A Ramp Rate = 10.612 A/s
RSEP9A Ramp Rate = 5.058 A/s
XSEP2T Ramp Rate = 5.803 A/s
XSEP4T

bschauml

Box Supplies Were Turned on at Setpoint 1

1 day 21 hours ago
Log Number: 4522406Logbook(s): Tags: Body: 

The following box supplies were TURNED ON AT SET POINT 1 by version 2-16 of the Box Supply Cycling Script:
ARC1A Ramp Rate = 7.954 A/s
ARC2A Ramp Rate = 6.939 A/s
ARC3A Ramp Rate = 9.548 A/s
ARC4A Ramp Rate = 10.989 A/s
ARC6A Ramp Rate = 9.222 A/s
ARC7A Ramp Rate = 9.736 A/s
ARC8A Ramp Rate = 11.962 A/s
ARC9A Ramp Rate = 9.205 A/s
ARCAA Ramp Rate = 12.234 A/s
DOG1E Ramp Rate = 3.872 A/s
DOG2E Ramp Rate N/A
DOG3E Ramp Rate N/A
DOG4E Ramp Rate N/A
DOG5E Ramp Rate N/A
DOG6E Ramp Rate N/A
DOG7E Ramp Rate N/A
DOG8E Ramp Rate N/A
DOG9E Ramp Rate N/A
RSEP8A Ramp Rate = 10.6

bschauml

COMMENT ON Flush Arc 5 JC Dipoles

1 day 22 hours ago
Log Number: 4522398Logbook(s): Body: 

This ATLis has expanded to include hose replacement on JC dipole. While flushing these dipoles they are finding failing hoses and having to replace them. This is predominantly the jumpers and return hoses.

wilsonn

Shift Information

Shift Swing
CEBAF Program
MCC Crew Chief Richardson
MCC Operators Anthony, Shriner
Program Deputy Duzik
Announcements

Access Status

Recent PSS History

recent pss history graph