Aggregator

Fopt 26may061657 results- to 3R

2 days 12 hours ago
Log Number: 4495682Logbook(s): Body: Fopt results from /usr/ntfs/public/optics/diforb/26may061657
Comment:
HOSTNAME: opsl02
CED WORKSPACE: OPS CED LOGIN KEY: pro
MYA DEPLOYMENT: ops
CONFIG PATH: /cs/prohome/apps/q/QTSnyder_QT5/1-2/fileio/config/cs.conf
DIFORB PATH: /usr/ntfs/public/optics/diforb
shriner

Fopt - After Inj-NL match back out

2 days 12 hours ago
Log Number: 4495681Logbook(s): Tags: Body: Fopt 7.9 completed successfully. The runtime settings include a sample count of 15, a minimum current of 4, and an operating regime of Standard with Excitation in 1S Region. The corrector and RF kicks applied were 0.488208 and 0.488208 volts respectively. The max. amplitude setting was 1 millimeters. The files for this run were saved in the directory /cs/opshome/hlapps/optics/diforb/26may061657. The X and Y stability of the machine during the run was 0.0351844 and 0.0247745 (mm) respectively.
shriner

HYST AREA 7-0 Cycles Magnets

2 days 12 hours ago
Log Number: 4495679Logbook(s): Body: 

HYST AREA Version 7-0 has successfully cycled the following:

MBC3S01H
MBC3S01V
MBC3S02H
MBC3S02V
MBC3S03H
MBC3S05H
MBC3S05V
MBC3S07H
MBC3S07V
MBC3S08H
MBC3S08V
MBC3S09H
MBC3S09V
MBC3S10H
MBC3S10V
MBM3E01H
MBM3E01V
MBM3E02H
MBM3E02V
MBM3E03H
MBM3E03V

Total Time: 0.517 mins

shriner

Fopt - after inj match back out

2 days 12 hours ago
Log Number: 4495677Logbook(s): Tags: Body: Fopt 7.9 completed successfully. The runtime settings include a sample count of 15, a minimum current of 4, and an operating regime of Standard with Excitation in 1S Region. The corrector and RF kicks applied were 0.488208 and 0.488208 volts respectively. The max. amplitude setting was 1 millimeters. The files for this run were saved in the directory /cs/opshome/hlapps/optics/diforb/26may061638. The X and Y stability of the machine during the run was 0.0589084 and 0.0276477 (mm) respectively.
shriner

HarpFitter: IHA2E01

2 days 13 hours ago
Log Number: 4495673Logbook(s): Body: 

Comments:

after inj match back out

Laser Used:

C Laser

Sigmas:

Peak 1 - x Sigma: 0.0928 Peak 2 - u Sigma: 0.2467 Peak 3 - y Sigma: 0.2845
shriner

FSD Masking Tool: Successful System Masking for: BeamLossMonitor

2 days 13 hours ago
Log Number: 4495672Logbook(s): Tags: Body: System Masking for: BeamLossMonitor
User: shriner
Areas: All

BeamLossMonitor Devices:
ILM0I07
ILM0L01A
ILM0L01B
ILM0L02
ILM2D00A
ILM2D00B
ILM0L04A
ILM0L04B
ILM0L05
ILM0L06A
ILM0L08
ILM0R01
ILM4D00
ILM0R03
ILM0R04
ILM0R06
ILM0R08
ILM0R09
ILM1L01
ILM1L02
ILM6R08
ILM3S00
ILM7S00
ILM9S00
ILM5S10
ILM5E03
ILM7S01
ILM9A01
ILM3E02
ILM5A01
ILM1A04
ILM1A06
ILM1A09
ILM5A10
ILM1A16
ILM1A19
ILM3R10
ILM9R07
ILM1R09
ILM2L03
ILM5R10
ILM5R05
ILM2L01
ILM2T09
ILM8T0
shriner

FSD Masking Tool: Partial Success Destination masking to: BSY

2 days 13 hours ago
Log Number: 4495670Logbook(s): Tags: Body: Destination Masking to: BSY
User: shriner



Mismatch Detected - Gold Masks vs. Control System Values!!!
See Values [Calculated / Control Sys] Masked = 1, UnMasked = 0

Node Name : BLMIN01
Ch. 1 Mismatch [ 0 / 1 ] ILM0I07 / BeamLossMonitor
Ch. 2 Mismatch [ 0 / 1 ] ILM0L01A / BeamLossMonitor
Ch. 3 Mismatch [ 0 / 1 ] ILM0L01B / BeamLossMonitor
Ch. 4 Mismatch [ 0 / 1 ] ILM0L02 / BeamLossMonitor
Ch. 5 Mismatch [ 0 / 1 ] ILM2D00A / BeamLossMonitor
Ch. 6 Mismatch [ 0 / 1 ] ILM2D00B / BeamLossMonitor

Node Name : BLMIN02
Ch.
shriner

HarpFitter: IHA1E01

2 days 13 hours ago
Log Number: 4495669Logbook(s): Body: 

Comments:

after backing out INJ-NL match

Laser Used:

C Laser

Sigmas:

Peak 1 - x Sigma: 0.2255 Peak 2 - u Sigma: 0.3534 Peak 3 - y Sigma: 0.3599
shriner

Operator SIGN IN

2 days 13 hours ago
Log Number: 4495664Logbook(s): Body:  ACCELERATOR OPERATOR SIGN IN FORM OPERATOR:    Shenenberger
DATE:             05/06/2026
SHIFT:               Swing

The operator has read the following:
alexs

Operator SIGN IN

2 days 13 hours ago
Log Number: 4495663Logbook(s): Body:  ACCELERATOR OPERATOR SIGN IN FORM OPERATOR:    Shriner
DATE:             05/06/2026
SHIFT:               Swing

The operator has read the following:
  • ELOG
  • PD Shift Plan
  • Radiation Surveys for PSS Segments in Controlled Access
  • PSS Log
shriner

Operator SIGN IN

2 days 13 hours ago
Log Number: 4495660Logbook(s): Body:  ACCELERATOR OPERATOR SIGN IN FORM OPERATOR:    Anthony
DATE:             05/06/2026
SHIFT:               Swing

The operator has read the following:
  • ELOG
  • PD Shift Plan
  • Radiation Surveys for PSS Segments in Controlled Access
  • PSS Log
anthony

Shift Information

Shift Owl
CEBAF Program
MCC Crew Chief Howard
MCC Operators Price, Chaudhary, Christian
Program Deputy Drury
Announcements

Access Status

Recent PSS History

recent pss history graph