Aggregator

iochaharp1 restored

6 days 15 hours ago
Log Number: 4468182Logbook(s): Tags: Body: restorelib 3.0.1 Target restore date was 2025-08-25 11:23:25 The output from the myRestore execution was as follows: iochaharp1 pcharp@2025-08-25 11:23 21(21) restored systemEnum@2025-08-25 11:23 2(2) restored Execute: /usr/csite/certified/bin/ced2Epics -ced ced -A -i iochaharp1 (success) PVs modified: 0 PVs modified: 0 PVs modified: 0 PVs modified: 0 PVs modified: 0 PVs modified: 0 PVs modified: 0 Procedure return status: Success
alarms

HYST AREA 7-0 Cycles Magnets

6 days 16 hours ago
Log Number: 4468178Logbook(s): Body: 
HYST AREA Version 7-0 has FAILED to cycle:

MBL0R01 -- NL01B11A -- softmag -- Failed to set after 2 cycle attempts
MBL0R02 -- NL01B11A -- softmag -- Failed to set after 2 cycle attempts
MBL0R03 -- NL01B11A -- softmag -- Failed to set after 2 cycle attempts
MBL0R04 -- NL01B11A -- softmag -- Failed to set after 2 cycle attempts


HYST AREA Version 7-0 has successfully cycled the following:

Area.Injector.PGun
Area.Injector.Linac
Area.Injector.Chicane

Total Time: 1.750 mins

janak

Autolog restore

6 days 16 hours ago
Log Number: 4468174Logbook(s): Tags: Body: saver ran from opsl632
Data from: /usr/opdata/burt/allsnap/12-22-25_07:16:38
Restored file: /tmp/02-03-26_08:22:21.snap


Starting Injector setup practice
janak

Operator SIGN IN

6 days 16 hours ago
Log Number: 4468171Logbook(s): Body:  ACCELERATOR OPERATOR SIGN IN FORM OPERATOR:    Janak
DATE:             02/03/2026
SHIFT:               Day

The operator has read the following:
  • ELOG
  • PD Shift Plan
  • Radiation Surveys for PSS Segments in Controlled Access
  • PSS Log
janak

PCup to FC1 part 1

6 days 17 hours ago
Log Number: 4468170Logbook(s): Entry Makers: jhowardBody: 

Started off struggling to get past A1 and A2 when first trying to send to FC1. Worked on a rough center through those to get to the next BPM. After that I was able to get beam centered through the pre buncher and MFX0I01 with no issue.

Centering through A1, A2 and the chopper was a challenge. I was able to center pretty well through A1 and A2, but putting the master slit in would block beam, so I was not centered though the chopper. I skipped ahead in the procedure to check centering through the solenoids near and in the chopper with the MS out.

jhoward

Autolog save

6 days 17 hours ago
Log Number: 4468165Logbook(s): Tags: Body: saver ran from opsl632

Saved: jhoward 02-03-26 07:34:41 {A:5 B:3 C:1 E:340 A=BS B=BS C=BS D=BS 0R08=0.00 0R08 dump in. dump(s) in.
jhoward

HYST AREA 7-0 Cycles Magnets

6 days 17 hours ago
Log Number: 4468161Logbook(s): Body: 

HYST AREA Version 7-0 has successfully cycled the following:

MFX2I01
MFX1I03
MFG1I04A
MFX0I01
MFA0I03
MFD0I04
MFA0I05
MFX0I05
MFX0I06
MFX0I07

Total Time: 0.617 mins

jhoward

CREW CHIEF SIGN IN

6 days 17 hours ago
Log Number: 4468158Logbook(s): Body: 
THOMAS JEFFERSON NATIONAL ACCELERATOR FACILITY
ACCELERATOR OPERATIONS CREW CHIEF SIGN IN FORM

Date : 02-03-26
Time : 07:07:16
Day : Tuesday
Shift : Day

Crew Chief : Humphry
Program Deputy: Mock
Team : B
Arm : RadCon
Designated SSO: Janak
LERF Operator:
Operators : Janak

This stamp certifies that the above Crew Chief has read/reviewed/received the following:
chumphry

Shift Information

Shift Owl
CEBAF Program
MCC Crew Chief Price
MCC Operators Smith
Program Deputy Mock
Announcements

Access Status

Recent PSS History

recent pss history graph