Aggregator

Operator SIGN IN

5 days 14 hours ago
Log Number: 4362524Logbook(s): Body:  ACCELERATOR OPERATOR SIGN IN FORM OPERATOR:    Yoon
DATE:             04/21/2025
SHIFT:               Swing

The operator has read the following:
  • ELOG
  • PD Shift Plan
  • Radiation Surveys for PSS Segments in Controlled Access
  • PSS Log
yoon

Operator SIGN IN

5 days 14 hours ago
Log Number: 4362521Logbook(s): Body:  ACCELERATOR OPERATOR SIGN IN FORM OPERATOR:    Anthony
DATE:             04/21/2025
SHIFT:               Swing

The operator has read the following:
  • ELOG
  • PD Shift Plan
  • Radiation Surveys for PSS Segments in Controlled Access
  • PSS Log
anthony

Follow-up Re: Hall B Lock BPM Excursions

5 days 14 hours ago
Log Number: 4362500Logbook(s): Body: 

The locking amp for IPM2C24X cavity was changing sensitivity in auto gain mode. This is a normal condition when the current in the cavity is ramping up. This sensitivity change was also occurring during static current running. The lockin amp associated with IPM2C24Y did not exhibit the same behavior. Obit lock was moved to IPM2C24B which is a digital receiver with a stripline bpm.

colek

CREW CHIEF SIGN IN

5 days 14 hours ago
Log Number: 4362499Logbook(s): Body: 
THOMAS JEFFERSON NATIONAL ACCELERATOR FACILITY
ACCELERATOR OPERATIONS CREW CHIEF SIGN IN FORM

Date : 04-21-25
Time : 15:48:55
Day : Monday
Shift : Swing

Crew Chief : Richardson
Program Deputy: Nguyen
Team : C
Arm : Yoon
Designated SSO: Anthony
LERF Operator:
Operators : Anthony, Yoon

This stamp certifies that the above Crew Chief has read/reviewed/received the following:
lrichard

iocsoftinspcevdp restored

5 days 15 hours ago
Log Number: 4362482Logbook(s): Tags: Body: restorelib 2.6 Target restore date was 2025-04-21 15:17:44 The output from the myRestore execution was as follows: iocsoftinspcevdp systemEnum@2025-04-21 15:17 2(2) restored Execute: /usr/csite/certified/bin/ced2Epics -ced ced -A -i iocsoftinspcevdp (success) PVs modified: 0 PVs modified: 0 PVs modified: 0 PVs modified: 0 PVs modified: 0 PVs modified: 0 Procedure return status: Success
alarms

rising BSYSB temp

5 days 15 hours ago
Log Number: 4362477Logbook(s): Entry Makers: shrinerBody: 

temps in building 98 have been steadily rising all day. will contact facilities and DC power when temps reach 85. this trend has been happening repeatedly over the past few days (figure 2) so may need some further attention.

shriner

iCalibrate: Hall D

5 days 15 hours ago
Log Number: 4362473Logbook(s): Body: Calibration ParametersHall:DTarget: 4.5x10-4 Al 40umPass: 5.5Note: Calibrated On:2025-Apr-06 05:52Calibrated By: shrinerFile:D-2025-04-06_0552_4.5x10-4_Al_40um_Pass-5.5.hcdIon ChamberExisting Setpoing (rads/hr)New Setpoint (rads/hr)East Wal
alexs

SLM Collinearity Checks

5 days 16 hours ago
Log Number: 4362452Logbook(s): Entry Makers: alexsBody: 

Fig 1 & 2: Hall B
Fig 3 & 4: Hall B + Hall D
Fig 5 & 6: Hall B + Hall D + Hall A (disregard fig 6, energy locks kicked in and moved the beam before I got the picture)

alexs

Shift Information

Shift Owl
CEBAF Program Physics!
MCC Crew Chief Price
MCC Operators Howard, Janak, Schaumloffel
Program Deputy Sereno
Announcements

Access Status

Recent PSS History

recent pss history graph