Aggregator

iCalibrate: Hall D

5 days 22 hours ago
Log Number: 4504221Logbook(s): Body: Calibration ParametersHall:DTarget: JD70-107 55um 45/135 degPass: 5.5Note: Calibrated On:2026-May-03 18:47Calibrated By: alexsFile:D-2026-05-03_1847_JD70-107_55um_45_135_deg_Pass-5.5.hcdIon ChamberExisting Setpoing (rads/hr)New Setpoint (rads/hr)
bjacob

iCalibrate: Hall C

5 days 23 hours ago
Log Number: 4504211Logbook(s): Body: Calibration ParametersHall:CTarget: Loop 2 10cmPass: 3Note: Calibrated On:2026-May-18 22:28Calibrated By: shrinerFile:C-2026-05-18_2228_Loop_2_10cm_Pass-3.hcdIon ChamberExisting Setpoing (rads/hr)New Setpoint (rads/hr)Compton1,872<
janak

xC resuming current increase

5 days 23 hours ago
Log Number: 4504207Logbook(s): Entry Makers: janakBody: 

At 10: xC went back to beam permit and requested 25uA on the Carbon 3% target again.
10:49 -> Resumed at 25uA
10:56 -> 30uA
11:00 -> 35uA
11:05 -> 40uA
11:10 -> 45uA
11:15 -> 50 uA Maximum current

janak

Negative gDsRt values in INX1L24, 1L25, 1L06

5 days 23 hours ago
Log Number: 4504205Logbook(s): Body: 

Negative photon dose rate values in the NDX detectors happen typically when there's a real radiation event, but HV is not supplied. Case of NL24 and NL25: for some reason, their HV readback is zero, and in the brief moments of a beam loss in the area the neighboring NDXs do see a normal response, but NL24 and NL25 are negative. The HV value for their I400 electrometer needs to be recovered. The intermittent case of 1L06 is not clear. HV is ON there. The events do not seem to be real radiation as there's no correlated neighbors' response. Cable contacts?

pavel

iCalibrate: Hall C

6 days ago
Log Number: 4504166Logbook(s): Body: Calibration ParametersHall:CTarget: Carbon 3%Pass: 3Note: Calibrated On:2026-May-25 08:00Calibrated By: dchriFile:C-2026-05-25_0800_Carbon_3__Pass-3.hcdIon ChamberExisting Setpoing (rads/hr)New Setpoint (rads/hr)Compton2,080
janak

xC Carbon 3% current ramp

6 days 1 hour ago
Log Number: 4504157Logbook(s): Entry Makers: janakBody: 

Including all current changes for xC incremental current ramp up.
08:14 -> 2uA
08:45 -> 3uA
08:50 -> 4uA
08:53 -> 5uA
08:58 -> 6uA
09:00 -> 7uA
09:05 -> 10uA
09:09 -> 15uA
09:17 -> 20uA
09:22 -> 25uA

At about 9:25 the hall made an access for SHMS troubleshooting.

janak

Shift Information

Shift Day
CEBAF Program
MCC Crew Chief Schoene
MCC Operators Barker, Thomas
Program Deputy Saitiniyazi
Announcements

Access Status

Recent PSS History

recent pss history graph