Aggregator

Fopt 26may250330 results

6 days 7 hours ago
Log Number: 4503923Logbook(s): Body: Fopt results from /usr/ntfs/public/optics/diforb/26may250330
Comment:
HOSTNAME: opsl03
CED WORKSPACE: OPS CED LOGIN KEY: pro
MYA DEPLOYMENT: ops
CONFIG PATH: /cs/prohome/apps/q/QTSnyder_QT5/1-2/fileio/config/cs.conf
DIFORB PATH: /usr/ntfs/public/optics/diforb
victorc

Fopt

6 days 7 hours ago
Log Number: 4503922Logbook(s): Tags: Body: Fopt 7.9 completed successfully. The runtime settings include a sample count of 15, a minimum current of 4, and an operating regime of Standard with Excitation in 1S Region. The corrector and RF kicks applied were 0.488208 and 0.488208 volts respectively. The max. amplitude setting was 1 millimeters. The files for this run were saved in the directory /cs/opshome/hlapps/optics/diforb/26may250330. The X and Y stability of the machine during the run was 0.0619804 and 0.130639 (mm) respectively.
victorc

Path Length corrections, orbit checks, 3rd pass Separation w/ xB & xD

6 days 7 hours ago
Log Number: 4503913Logbook(s): Entry Makers: dchriBody: 

3rd pass Separation w/ xB & xD was mainly fixed by reducing vernier by ~11.0
xB & xD are now 'more' on top of one another than before

In between steering adjustments done by a fellow operator (they have a separate ELog detailing those changes)

Fig. 13
Lots of adjustments to get rates down, overall better than it was before we started

Fig. 1,2
Using xB beam TUNE
Before corrections

Fig. 3,4
Using xD beam TUNE
Before corrections

Fig. 5
corrections w/ xB beam TUNE

Fig. 6
Using xB beam TUNE
After DogLeg corrections

Fig. 7
Using xD beam TUNE
After DogLeg corrections

Fig.

dchri

Pass 3 separation

6 days 8 hours ago
Log Number: 4503905Logbook(s): Entry Makers: kpriceBody: 

D beam is really hard to see on 8E viewer; putting a box around it makes it impossible to distinguish from the background (fig 6). If the box is centered on D beam, it's easy to see how far away B is (figs 7 and 8). BPMs make it pretty clear.

kprice

Shift Information

Shift Day
CEBAF Program
MCC Crew Chief Schoene
MCC Operators Barker, Thomas
Program Deputy Saitiniyazi
Announcements

Access Status

Recent PSS History

recent pss history graph