Aggregator
BSYSB Temps Creeping up again
MQABE04 mismatch
Crew Chief Timesheet Summary: 11 Apr 2025 SWING
56 Minute Run(!)
scraping by NL C100s
Building Temperature screen does not include Hall D
1L11-1,2 Waveguide only trips
This cavity pair has been tripping frequently on waveguide only. WG vacuum sits around 2.6e-8 and spikes up two orders of magnitude. Can the waveguide vacuum be looked at when time permits? According to Cavity history, the rate is independant of GSET.
Injector Alarm Limits Set
MQB2L10 mismatch
OMNL01 Gradual Decay
ILM5E03 HV Mismatching
This BLM's HV readback seems to be falling out of range, bouncing between values of ~720-730 V. SSG was contacted, but instructed MCC to continue monitoring the voltage as this discrepancy in voltage is relatively minor and to re-contact them should voltage drop below 700 V.
MQABE04 Mismatch
Checking how 1L09 reacts to fudge
With 1L09 being the new zone in the NL after this past SAM, and the issues with fudge have only showed up after this past SAM, wanted to check out the response of 1L09 when adjusting NL fudge.
Compared against other C100 cavities of the same gradient setpoint that I could find to match a 1L09 cavity.
Seems as though 1L09 responds the same as the C100 cavities for the 3 out of 5 cavities I could find the same setpoint for.
Beamline drawing not accessible
Could someone please post the PDF of the hall B beamline linked on the OPs menu here:
http://opsntsrv.acc.jlab.org/ops_docs/online_document_files/MCC_online_f...
https://epicsweb.jlab.org/wmenu/#HallBBeamDeliveryOptions-page
It requires a microsoft login account to view the linked pdf. This should probably be fixed to allow cue accounts too, or better yet, no accounts to view.
Downtime Incident CLOSED: ILM5E03 HV Mismatch
ILM5E03 HV Mismatching
Downtime Incident CREATED: ILM5E03 HV Mismatch
The OPS DRVHs for the following cavities have been updated: 2L08-3
The OPS DRVHs for the following cavities have been updated:
2L08-3
Username: benesch
Date/Time: 04-20-25_09:52:11
RF Status: Good
Tuner Status: Good
Comment: DRVH=7.900 Arc Rate Management four at 8.01, irregular spacing
Previous OPS DRVH: 8.3
Special Instructions:
The OPS DRVHs for the following cavities have been updated: 1L08-7
The OPS DRVHs for the following cavities have been updated:
1L08-7
Username: benesch
Date/Time: 04-20-25_09:50:44
RF Status: Good
Tuner Status: Good
Comment: DRVH=6.000 Arc Rate Management shorter interval after reduction to 6.2?
Previous OPS DRVH: 6.2
Special Instructions: