Follow-up Re: FFTs Spectra of Injector BPMs

6 days 19 hours ago
Log Number: 4490404Logbook(s): Body: 

Back in the late 1990s I did simulations of the effects of intensity modulation on the indicated positions for SEE BPMs. See attached from the beam instrumentation workshop in 2000. I did not take it out to 28 kHz but intensity modulation at that frequency will cause issues if you are using linac style BPMs. Transport style BPMs are under sampled at 28 kHz intensity modulation. It may be best to use a BCM cavity to confirm the frequency content and magnitude of intensity modulation at 28 kHz.

powers

FFTs Spectra of Injector BPMs

6 days 20 hours ago
Log Number: 4490396Logbook(s): Entry Makers: suleimanBody: 

With 10 uA from Hall A laser to FC1 - Figure 1.
Figures 2-3: First three BPMs in Injector. There is the 20 kHz peak in x and y positions.

With 10 uA from Hall C laser to FC1.
Figure 4: First three BPMs in Injector. Very prominant peak at 28 kHz in all spectra.
Figure 5: with RTP OFF - no change.

With 10 uA from Hall B laser to PCup.
Figure 6: First three BPMs in Injector. Very prominant peak at 28 kHz in all spectra.

With 10 uA from Hall D laser to PCup.
Figure 7: First three BPMs in Injector. Overall noisy spectra.

Halls B and C show very large peak in wire-sum FFT at 28 kHz.

suleiman

COMMENT ON MCC NL LO RFoF Tx swap

6 days 20 hours ago
Log Number: 4490395Logbook(s): Body: 

No PTW is required. This task involves only reconnecting the fiber cable between two RFoF transmitters, which should take about 30 minutes to complete. If the Ops team thinks the gang phase issue has disappeared, this task will no longer be necessary.

plawski

Operator SIGN IN

6 days 20 hours ago
Log Number: 4490393Logbook(s): Body:  ACCELERATOR OPERATOR SIGN IN FORM OPERATOR:    Barker
DATE:             04/22/2026
SHIFT:               Day

The operator has read the following:
  • ELOG
  • PD Shift Plan
  • Radiation Surveys for PSS Segments in Controlled Access
  • PSS Log
bbarker

HDR A.M Walks

6 days 21 hours ago
Log Number: 4490391Logbook(s): Entry Makers: BpauleyBody: 

Carried out visual and operational inspections in HDR. All systems are operating normal at this time.

cryo

CHL1-2 A.M Walks

6 days 21 hours ago
Log Number: 4490390Logbook(s): Entry Makers: BpauleyBody: 

Carried out visual and operational inspections in CHL1-2. Found ceiling lamp lens/cover is not secured properly & hanging by one hinge.

cryo

CREW CHIEF SIGN IN

6 days 21 hours ago
Log Number: 4490382Logbook(s): Body: 
THOMAS JEFFERSON NATIONAL ACCELERATOR FACILITY
ACCELERATOR OPERATIONS CREW CHIEF SIGN IN FORM

Date : 04-22-26
Time : 07:16:45
Day : Wednesday
Shift : Day

Crew Chief : Blackshaw
Program Deputy: Ogur
Team : E
Arm : RadCon
Designated SSO: Barker
LERF Operator:
Operators : Barker

This stamp certifies that the above Crew Chief has read/reviewed/received the following:
bjacob

QE Measurement

6 days 23 hours ago
Log Number: 4490377Logbook(s): Body: Spot Location: (13250,19250), Charge: 17.908261999999993

Laser Wavelength Atten Setting Laser Power Current HV PS Current QE PV Updated? Update Time/Reason Not Updated (nm) (W) (uA)</
msmith

Shift Information

Shift Day
CEBAF Program
MCC Crew Chief Blackshaw
MCC Operators Humphry, Janak, Schoene
Program Deputy Sereno
Announcements

Access Status

Recent PSS History

recent pss history graph