Partial SRF HCO of 2L26

6 days 21 hours ago
Log Number: 4490603Logbook(s): Entry Makers: michaelmBody: 

2L26:
Bay 4 not making it to HV. (Cav. 6/8)
2L26-1 drops zone from HV on high reflected power

ARCs: All 8 arc detectors okay.

IRs:
-Cold test: Cav. 1 non-responsive; cav. 7 responding wrong direction when cold window test actuated. All 8 channels trigger FSD when trip set point below readback.
-Warm test: All 8 warm window test driving voltage down, not up.

michaelm

North Linac Dropping to Lockdown

6 days 22 hours ago
Log Number: 4490588Logbook(s): Entry Makers: deirBody: 

At 01:45 last night, the NL dropped to Restricted Lockdown. The iFix alarms panel shows the reason was the personnel door was opened for Exit Stair 1. Checking the door status, it shows the ES1 doors were made up.

I went out to ES1 to check and I didn't see any personnel or vehicles, and the door maglites were illuminated.

When the guards dropped off the door check, it shows that Exit Stair 1 was checked at 01:45. The guards don't have a way to unlock that door, so I'm assuming the door was physically jostled to verify that it was locked, causing the NL to drop to lockdown.

deir

Operator SIGN IN

6 days 22 hours ago
Log Number: 4490585Logbook(s): Body:  ACCELERATOR OPERATOR SIGN IN FORM OPERATOR:    Barker
DATE:             04/23/2026
SHIFT:               Day

The operator has read the following:
  • ELOG
  • PD Shift Plan
  • Radiation Surveys for PSS Segments in Controlled Access
  • PSS Log
bbarker

COMMENT ON Q0 Measurements via Flow Meter on Zone 2L25

6 days 23 hours ago
Log Number: 4490577Logbook(s): Body: 

Came in and started ramping cryo heaters down. After the slow ramp down, I calibrated the meter to be within tolerance. Initial Calibrations took some time, however, now that it's done it should not need to be redone for the rest of this measurement. I began taking cavity dissipation measurements around 2:30 am. Below are some rough results. More precise results will follow after analyzing the data in detail. However, for now, the below results should suffice. The remaining cavities will be measured tomorrow.

dchri

Shift Information

Shift Owl
CEBAF Program
MCC Crew Chief Howard
MCC Operators Price, Chaudhary, Christian
Program Deputy Sereno
Announcements

Access Status

Recent PSS History

recent pss history graph