nonNRTL stickers on TMGs
Program Deputy Summary, presented 2026-04-24
COMMENT ON Troubleshoot 2L13-8 tuner hardware
We unplugged the motor cable,was able to turn coupling by hand.We hooked up the drive box and was able to turn freely in both directions. We contacted MCC and let them try to move the coupling and got intermittent movement.They told us to use our drive box and to turn the motor 5 revolutions counterclockwise to get the cavity detuned.
QuickPic - South Linac Partial Survey
2L25 RT valve
Operator SIGN IN
COMMENT ON Q0 Measurements via Flow Meter on Zone 2L25
summary of 2L25 Flow Meter trends and results:
Zone 2L25 Helium Flow Meter Cavity Heat Dissipation Measurements
April 23 24, 2026
Zone 2L25 Helium Flow Meter Cavity Heat Dissipation Measurements
April 23 24, 2026
Heat dissipation measurements were taken across all 8 cavities in zone 2L25 using the Hunt and Match method with the helium flow meter in Sawtooth mode.
Cryo heater baseline was held at ~30W (readback ~40-44W depending on cavity)
JT valve was manually fixed at 45% during measurements
Cavity 1 was measured across a full gradient range (8-20 MV/m)
remaining cavities were measured at
Operator SIGN IN
Gun HV Turned Off
RF On/Off turned HV Off
Gun HV Rampdown Initiated
Operator SIGN IN
summary of 2L25 Flow Meter trends and results
Zone 2L25 â Helium Flow Meter Cavity Heat Dissipation Measurements
April 23â24, 2026
See ATLis for additional details
https://tasklists.jlab.org/atlis/tasks/120026
Heat dissipation measurements were taken across all 8 cavities in zone 2L25 using the Hunt and Match method with the helium flow meter in Sawtooth mode.
Crew Chief Shift Log, 2026-04-24 OWL
Start of shift: Degrader beam studies ongoing.
Crew Chief Timesheet Summary: 24 Apr 2026 OWL
CREW CHIEF SIGN IN
THOMAS JEFFERSON NATIONAL ACCELERATOR FACILITY
ACCELERATOR OPERATIONS CREW CHIEF SIGN IN FORM
Date : 04-24-26
Time : 07:13:56
Day : Friday
Shift : Day
Crew Chief : Humphry
Program Deputy: Sereno
Team : X
Arm : Schoene
Designated SSO: Barker
LERF Operator:
Operators : Barker, Schoene
This stamp certifies that the above Crew Chief has read/reviewed/received the following:
Box Supplies Were Turned Off
COMMENT ON MOLLER Beam Study: Chopper Scans
Chopper scans:
https://logbooks.jlab.org/entry/4490663