Aggregator

HYST AREA 7-0 Cycles Magnets for eDT

6 days 11 hours ago
Log Number: 4510914Logbook(s): Body: 

HYST AREA Version 7-0 has successfully cycled the following:

Magnets contained in the following file: /tmp/matchingTool.snap_8clXEJ
MQK5S04
MQK5S05
MQK5S06
MQA5S07
MQA5S08
MQA5S09
MQK5S10

Total Time: 2.733 mins

dchri

IHA5E01 X-plane Emittance Measurement Analysis

6 days 12 hours ago
Log Number: 4510907Logbook(s): Body: IHA5E01 X-plane Emittance Measurement Analysis
qsUtility Data Analyzer V7-43
SDDS FILE: /a/opsdata/fiefdata/fileio/q/qsUtility/data/D1-0/IHA5E01/IHA5E01_x_zigzag_2026-06-12_02:28:25/IHA5E01_zigzag_2026-06-12_02:28:25_qsUtility_analyzer.sdds
HOSTNAME: opsl05 CED WORKSPACE: OPS CED LOGIN KEY: pro
jhoward

Fopt 26jun120215 results: before 5E match

6 days 12 hours ago
Log Number: 4510904Logbook(s): Body: Fopt results from /usr/ntfs/public/optics/diforb/26jun120215
Comment: before 5E match
HOSTNAME: opsl01
CED WORKSPACE: OPS CED LOGIN KEY: pro
MYA DEPLOYMENT: ops
CONFIG PATH: /cs/prohome/apps/q/QTSnyder_QT5/1-2/fileio/config/cs.conf
DIFORB PATH: /usr/ntfs/public/optics/diforb
victorc

Fopt - before 5E match

6 days 12 hours ago
Log Number: 4510902Logbook(s): Tags: Body: Fopt 7.9 completed successfully. The runtime settings include a sample count of 15, a minimum current of 4, and an operating regime of Standard with Excitation in 1S Region. The corrector and RF kicks applied were 1.50006 and 1.50006 volts respectively. The max. amplitude setting was 1 millimeters. The files for this run were saved in the directory /cs/opshome/hlapps/optics/diforb/26jun120215. The X and Y stability of the machine during the run was 0.0446661 and 0.0435287 (mm) respectively.
victorc

Arc 4 M56 - up to 5R - post 4E match - Vert & Horiz dispersion checked w/ no corrections needed

6 days 12 hours ago
Log Number: 4510901Logbook(s): Entry Makers: dchriBody: 

Fig.1
M56 Before setting ACCSIZE from 60 --> 600

Fig.2
M56 After setting ACCSIZE from 60 --> 600

Fig.3
M5,6 signals - Before Arc 1,2 offset --> 0.001

Fig.4
M5,6 signals - Before Arc 1,2 offset --> 0.001, More than 0.2 mm deviate, corrections needed

Fig.5
Arc Quad corrections

Fig.6
After Arc Quad corrections & offset removed - no corrections needed

Fig.7,8,9
Horizontal & Vert dispersion - no corrections needed

dchri

Shift Information

Shift Day
CEBAF Program
MCC Crew Chief Richardson
MCC Operators Barker, Thomas
Program Deputy Nissen
Announcements

Access Status

Recent PSS History

recent pss history graph