Aggregator
Adjusted MDR1I02 (15 degree dipole) setpoint for 140 kV operation
FSD window set point for 15 deg dipole (MDR1I02 Low Noise Supply) for 140 kV Gun operation is updated.
FSD window set point for 15 deg dipole (MDR1I02 Low Noise Supply) for 140 kV Gun operation is updated.
Crew chief changed the MDR1I02 setpoint from -2.6 A to -2.08 A.
Max Bruker provided the new set point for 140 kVas -2.08 A. High and low limits are set as 20% of the nominal per Joe Grames instruction.
Per Scott Higgins request he is been notified about this change.
QuickPic - N. Linac Full Survey
iocw6se1 restored
iocw6se1 restoration failed
Momentum scaling
Gammas and betas for 200 keV and 140 keV so I don't have to recalculate every time.
>>> gamma
array([1.39138943, 1.2739726 ])
>>> beta
array([0.69531404, 0.61956388])
>>> beta * gamma
array([0.96745261, 0.78930741])
The factor between the two (for magnet scaling) is:
1.2256981170372578
Gun comparator set points in HV Gun Comparator in FSD is updated for 140 kV operation.
Gun HV limit set points updated to 140 kV
Injector AllSave Reference for Last Run at 140kV
APPROVED Gun2 photocathode Heat and Activation - March 2026
RF On/Off turned HV Off
Box Supplies Were Turned Off
The following box supplies were TURNED OFF by version 2-16 of the Box Supply Cycling Script:
ARC1A Ramp Rate = 7.400 A/s
ARC2A Ramp Rate = 7.131 A/s
ARC3A Ramp Rate = 9.294 A/s
ARC4A Ramp Rate = 10.144 A/s
ARC5A Ramp Rate = 9.307 A/s
ARC6A Ramp Rate = 9.326 A/s
ARC8A Ramp Rate = 11.455 A/s
ARC9A Ramp Rate = 9.322 A/s
ARCAA Ramp Rate = 11.756 A/s
DOG1E Ramp Rate = 2.750 A/s
DOG2E Ramp Rate N/A
DOG3E Ramp Rate N/A
DOG4E Ramp Rate N/A
DOG5E Ramp Rate N/A
DOG6E Ramp Rate N/A
DOG7E Ramp Rate N/A
DOG8E Ramp Rate N/A
DOG9E Ramp Rate N/A
RSEP8A Ramp Rate = 10.544 A/s
RSEP9A










