Log Number: 4475047Logbook(s): Body: 

1L12-6: Klystron replaced 3/6/26. L3 ser.# 206 removed and Stallant tube installed. Serial number is hard to read. Will try to figure out what the number is. Techs: G. Kepler and S. Holben

holben

Operator SIGN IN

6 days 6 hours ago
Log Number: 4475046Logbook(s): Body:  ACCELERATOR OPERATOR SIGN IN FORM OPERATOR:    Barker
DATE:             03/09/2026
SHIFT:               Day

The operator has read the following:
  • ELOG
  • PD Shift Plan
  • Radiation Surveys for PSS Segments in Controlled Access
  • PSS Log
bbarker

Operator SIGN IN

6 days 6 hours ago
Log Number: 4475044Logbook(s): Body:  ACCELERATOR OPERATOR SIGN IN FORM OPERATOR:    Thomas
DATE:             03/09/2026
SHIFT:               Day

The operator has read the following:
  • ELOG
  • PD Shift Plan
  • Radiation Surveys for PSS Segments in Controlled Access
  • PSS Log
dthomas

iocw6se1 restoration failed

6 days 7 hours ago
Log Number: 4475038Logbook(s): Tags: Body: restorelib 3.0.1 Target restore date was 2026-03-09 07:24:32 The output from the myRestore execution was as follows: iocw6se1 systemEnum@2026-03-09 07:24 The following do not have write permission iocw6se1:CAsecure_clr.OUTC iocw6se1:CAsecure_clr.OUTD 0(2) restored seebpm@2026-03-09 07:24 The following do not have write permission IOCW6SE1:CTsub.STR1 IPM2R01.BCAL IPM2R01.BDIS IPM2R01.HOPD IPM2R01.HOPI IPM2R01.HPDI IPM2R01.LOPD IPM2R01.LPDI IPM2R01.MDEL IPM2R01.SFBC IPM2R01.SFRF IPM2R01.THET IPM2R01.XA1C IPM2R01.XALP IPM2R01.XEMN
sethg

iocw6se1 restoration failed

6 days 7 hours ago
Log Number: 4475037Logbook(s): Tags: Body: restorelib 3.0.1 Target restore date was 2026-03-09 07:24:32 The output from the myRestore execution was as follows: iocw6se1 systemEnum@2026-03-09 07:24 2(2) restored seebpm@2026-03-09 07:24 The following are not available in EPICS IOCW6SE1:CTsub.STR1 IPM2R01.XA1C IPM2R01.XEMN IPM2R01.XEMX IPM2R01.XGLD IPM2R01.XNIN IPM2R01.XNIR IPM2R01.XNIX IPM2R01.XPIN IPM2R01.XPIR IPM2R01.XPIX IPM2R01.YA1C IPM2R01.YEMN IPM2R01.YEMX IPM2R01.YGLD IPM2R01.YNIN IPM2R01.YNIR IPM2R01.YNIX IPM2R01.YPIN IPM2R01.YPIR IPM2R01.YPIX IPM2R02.XA1C IPM2R0
alarms

CREW CHIEF SIGN IN

6 days 7 hours ago
Log Number: 4475036Logbook(s): Body: 
THOMAS JEFFERSON NATIONAL ACCELERATOR FACILITY
ACCELERATOR OPERATIONS CREW CHIEF SIGN IN FORM

Date : 03-09-26
Time : 07:10:54
Day : Monday
Shift : Day

Crew Chief : Mock
Program Deputy: Schoene
Team : B
Arm : Barker
Designated SSO: Thomas
LERF Operator:
Operators : Barker, Thomas

This stamp certifies that the above Crew Chief has read/reviewed/received the following:
mock

IPM8R07A HW Dis Alarm

6 days 11 hours ago
Log Number: 4475028Logbook(s): Entry Makers: samariBody: 

The entire stack alarmed with an X and Y SAT alarm on channel 5 (IPM8R06), so attempted to clear it via twiddle tunnel and channel 6 (IPM8R07A) went into alarm and can't be cleared. An ioc reboot was attempted without luck.

samari

iocw6se1 restored

6 days 11 hours ago
Log Number: 4475027Logbook(s): Tags: Body: restorelib 3.0.1 Target restore date was 2026-03-09 02:59:55 The output from the myRestore execution was as follows: iocw6se1 systemEnum@2026-03-09 02:59 2(2) restored seebpm@2026-03-09 02:59 1933(1933) restored Pause: 30 second(s) SEE_BURT 43(43) restored Execute: /usr/csite/certified/bin/ced2Epics -ced ced -A -i iocw6se1 (success) PVs modified: 0 PVs modified: 0 PVs modified: 0 PVs modified: 0 PVs modified: 0 PVs modified: 0 PVs modified: 0 Procedure return status: Success
alarms

Operator SIGN IN

6 days 14 hours ago
Log Number: 4475026Logbook(s): Body:  ACCELERATOR OPERATOR SIGN IN FORM OPERATOR:    Smith
DATE:             03/09/2026
SHIFT:               Owl

The operator has read the following:
  • ELOG
  • PD Shift Plan
  • Radiation Surveys for PSS Segments in Controlled Access
  • PSS Log
msmith

Operator SIGN IN

6 days 14 hours ago
Log Number: 4475025Logbook(s): Body:  ACCELERATOR OPERATOR SIGN IN FORM OPERATOR:    Samari
DATE:             03/08/2026
SHIFT:               Owl

The operator has read the following:
  • ELOG
  • PD Shift Plan
  • Radiation Surveys for PSS Segments in Controlled Access
  • PSS Log
samari

CREW CHIEF SIGN IN

6 days 15 hours ago
Log Number: 4475024Logbook(s): Body: 
THOMAS JEFFERSON NATIONAL ACCELERATOR FACILITY
ACCELERATOR OPERATIONS CREW CHIEF SIGN IN FORM

Date : 03-08-26
Time : 23:02:21
Day : Sunday
Shift : Owl

Crew Chief : Deir
Program Deputy: Schoene
Team : A
Arm : Smith
Designated SSO: Samari
LERF Operator:
Operators : Samari, Smith

This stamp certifies that the above Crew Chief has read/reviewed/received the following:
deir

Shift Information

Shift Day
CEBAF Program
MCC Crew Chief Humphry
MCC Operators Blackshaw, Janak
Program Deputy Roblin
Announcements

Access Status

Recent PSS History

recent pss history graph