Aggregator

iocipmm603 restored

6 days 23 hours ago
Log Number: 4367882Logbook(s): Tags: Body: restorelib 2.6 Target restore date was 2025-04-30 14:04:00 The output from the myRestore execution was as follows: iocipmm603 <NOTE> bpmdr: Provided macro *IOC* is never used bpmdr bpmdr_ALPHA@2025-04-30 14:04 2(2) restored bpmdr_CALCONS@2025-04-30 14:04 17(17) restored bpmdr_CALFACS1@2025-04-30 14:04 6(6) restored bpmdr_CALFACS2@2025-04-30 14:04 12(12) restored bpmdr_DISBPM@2025-04-30 14:04 1(1) restored bpmdr_GOF2BPM@2025-04-30 14:04 12(12) restored bpmdr_GOFBPM@2025-04-30 14:04 5(5) restore
alarms

Phaser Results

6 days 23 hours ago
Log Number: 4367880Logbook(s): Body: Results where Job # is 910 {8} CAVITY PHASE ERROR (DEGREES) OUTCOME PHASE (DEGREES) START DATE DURATION (SECONDS) CORRECTION DATE CORRECTION ERROR REASON 1L15-8 -2.33 CORRECTED 22.20 30-Apr-2025 14:14 56</t
mmerz

COMMENT ON All Accelerator Box PS and Shunts HCO - Winter 2025

6 days 23 hours ago
Log Number: 4367867Logbook(s): Body: 

HCO was completed on CP1P01 Box Power Supply. Data collected as ramping supply to 12GEV setpoint. Hmax value is being changed to 360A since previous Hmax value caused the supply to get stuck before reaching value. Supply will be hysteresis cycled once this value has been changed in CED. Supply will run for an 8 hour period to determine output stability.

-O'Brien, Banks

kevino

HYST AREA 6-4-1 Cycles Magnets

6 days 23 hours ago
Log Number: 4367866Logbook(s): Body: 

HYST AREA Version 6-4-1 has successfully cycled the following:

MBD1C00V
MBD1C00AV
MBC1C01H
MBC1C02V
MBC1C03H
MBC1C04H
MBC1C05V
MBC1C06H
MBC1C07H
MBC1C07V
MBC1C09V
MBC1C11V
MBC1C13V
MBC1C15V
MBC1C18H
MBC1C18V
MBC1C20H
MBC1C20V
MBT1P01H
MBT1P04H
MBC1H01H
MBC1H01V
MBD1H04V
MBD1H04H

Total Time: 1.667 mins

dchri

Shift Information

Shift Day
CEBAF Program Physics!
MCC Crew Chief Schoene
MCC Operators Barker, Mock, Samari, Shenenberger
Program Deputy Sereno
Announcements

Access Status

Recent PSS History

recent pss history graph