Aggregator

Injector Work Summary

6 days 22 hours ago
Log Number: 4475312Logbook(s): Entry Makers: samariBody: 

Riad asked me to go ahead and start setting up beam in viewer limited to the 1D. I Downloaded magnet setpoints from the 2024 run all save and turned off warm RF. I steered centered on solenoids and increased lense strength where the spot seemed unyieldy. Once I was to the 1D and centered through A1,A2, and the MS, I began phasing RF with CH1X as baseline phase as per procedure. First phasing prebuncher and buncher once I had A beam in the correct phase relative the CH1X. I then phased the other lasers and Ch1Y, setting gradient to about 120 viewer units.

samari

Autolog save

6 days 22 hours ago
Log Number: 4475310Logbook(s): Tags: Body: saver ran from opsl632

Saved: samari 03-10-26 08:01:57 {A:i B:5 C:2 E:345 A=Pulse B=Pulse C=Pulse D=Pulse 0R08=0.00 0R08 dump in. 140 KV gun set up to 1D in VL.
samari

Rough Chopper set up

6 days 22 hours ago
Log Number: 4475307Logbook(s): Entry Makers: samariBody: 

All 4 beams phased in their run correct buckets (D might need a 180 flip) and making it to the 1D. I am nearly off shift so documenting my progress. I did have to strengthen MFA0I05.

samari

CREW CHIEF SIGN IN

6 days 23 hours ago
Log Number: 4475293Logbook(s): Body: 
THOMAS JEFFERSON NATIONAL ACCELERATOR FACILITY
ACCELERATOR OPERATIONS CREW CHIEF SIGN IN FORM

Date : 03-10-26
Time : 07:11:13
Day : Tuesday
Shift : Day

Crew Chief : Mock
Program Deputy: Schoene
Team : B
Arm : Barker
Designated SSO: Thomas
LERF Operator:
Operators : Barker, Thomas

This stamp certifies that the above Crew Chief has read/reviewed/received the following:
mock

Box Supplies Were Turned Off

6 days 23 hours ago
Log Number: 4475291Logbook(s): Tags: Body: 

The following box supplies were TURNED OFF by version 2-16 of the Box Supply Cycling Script:
ARC1A Ramp Rate = 6.964 A/s
ARC2A Ramp Rate = 6.712 A/s
ARC3A Ramp Rate = 9.294 A/s
ARC4A Ramp Rate = 9.299 A/s
ARC5A Ramp Rate = 9.307 A/s
ARC6A Ramp Rate = 8.835 A/s
ARC8A Ramp Rate = 10.637 A/s
ARC9A Ramp Rate = 9.322 A/s
ARCAA Ramp Rate = 10.852 A/s
DOG1E Ramp Rate = 2.750 A/s
DOG2E Ramp Rate N/A
DOG3E Ramp Rate N/A
DOG4E Ramp Rate N/A
DOG5E Ramp Rate N/A
DOG6E Ramp Rate N/A
DOG7E Ramp Rate N/A
DOG8E Ramp Rate N/A
DOG9E Ramp Rate N/A
RSEP8A Ramp Rate = 10.104 A/s
RSEP9A

alarms

Prebuncher + buncher phasing

6 days 23 hours ago
Log Number: 4475289Logbook(s): Entry Makers: samariBody: 

I loaded the values for the prebuncher and buncher from the 2024 all save (pb=3.55, b=4.3 gset), and phased accordingly.

Fig 1: Prebuncher + buncher off
Fig 2: Prebuncher on
Fig 3: Buncher+prebuncher on

samari

VL Steer to 1D

6 days 23 hours ago
Log Number: 4475288Logbook(s): Entry Makers: samariBody: 

Loaded All save from previously known 140 KeV set up (wiens off), then threaded beam through to the 1D with all warm RF off. I had to make a few solenoid changes to get good enough beam for transport. I roughly centered through all lenses up to 1D. Attached is the viewer walk and the differences from the all save.

samari

Shift Information

Shift Owl
CEBAF Program
MCC Crew Chief Howard
MCC Operators Price, Chaudhary
Program Deputy Roblin
Announcements

Access Status

Recent PSS History

recent pss history graph