Aggregator

After chopper recovery and setup beams A, B and C are setup to the inline dump.

6 days 13 hours ago
Log Number: 4368542Logbook(s): Entry Makers: kazimiBody: 

Set up the choppers as well as I could. We need more time to check steering and dechopping. However, we should be good for the program at hand which is beam to A, B and D. If RF group changes the chopper 1Y system (amplifier change or something else) tomorrow, then we need to check things again. Therefore I see no point in spending too much time now.

Figures 1,2,3 are A beam zero posed
Figure 4,5 are B beam
Figure 6,7 are D beam

A save with orbit lock and energy locks on for A Beam is done. 25767

kazimi

Autolog save

6 days 13 hours ago
Log Number: 4368540Logbook(s): Tags: Body: saver ran from opsl07

Saved: kazimi 05-02-25 00:23:53 {A:5 B:5 C:5 E:1060 A=CW B=BS C=BS D=BS 0R08=0.00 0R08 dump in. A,B and D beams CW to inline dump. dechopping is not ideal.
kazimi

Operator SIGN IN

6 days 13 hours ago
Log Number: 4368533Logbook(s): Body:  ACCELERATOR OPERATOR SIGN IN FORM OPERATOR:    Price
DATE:             05/02/2025
SHIFT:               Owl

The operator has read the following:
  • ELOG
  • PD Shift Plan
  • Radiation Surveys for PSS Segments in Controlled Access
  • PSS Log
kprice

Operator SIGN IN

6 days 13 hours ago
Log Number: 4368532Logbook(s): Body:  ACCELERATOR OPERATOR SIGN IN FORM OPERATOR:    Howard
DATE:             05/02/2025
SHIFT:               Owl

The operator has read the following:
  • ELOG
  • PD Shift Plan
  • Radiation Surveys for PSS Segments in Controlled Access
  • PSS Log
jhoward

chopper 1Y troubleshooting

6 days 15 hours ago
Log Number: 4368514Logbook(s): Entry Makers: geesamanlfarrishBody: 

started troubleshooting the chopper 1Y chassis after the system couldn't regulate the phase and amplitude earlier today
we removed 1 dB pad to have some headroom in the drive signal. This didn't last long as we had to come back after couple of hours with the same issue

bachiman

Shift Information

Shift Day
CEBAF Program Physics!
MCC Crew Chief Schoene
MCC Operators Barker, Mock, Samari, Shenenberger
Program Deputy Sereno
Announcements

Access Status

Recent PSS History