Aggregator

Operator SIGN IN

6 days 9 hours ago
Log Number: 4368533Logbook(s): Body:  ACCELERATOR OPERATOR SIGN IN FORM OPERATOR:    Price
DATE:             05/02/2025
SHIFT:               Owl

The operator has read the following:
  • ELOG
  • PD Shift Plan
  • Radiation Surveys for PSS Segments in Controlled Access
  • PSS Log
kprice

Operator SIGN IN

6 days 9 hours ago
Log Number: 4368532Logbook(s): Body:  ACCELERATOR OPERATOR SIGN IN FORM OPERATOR:    Howard
DATE:             05/02/2025
SHIFT:               Owl

The operator has read the following:
  • ELOG
  • PD Shift Plan
  • Radiation Surveys for PSS Segments in Controlled Access
  • PSS Log
jhoward

chopper 1Y troubleshooting

6 days 10 hours ago
Log Number: 4368514Logbook(s): Entry Makers: geesamanlfarrishBody: 

started troubleshooting the chopper 1Y chassis after the system couldn't regulate the phase and amplitude earlier today
we removed 1 dB pad to have some headroom in the drive signal. This didn't last long as we had to come back after couple of hours with the same issue

bachiman

Shift Information

Shift Day
CEBAF Program Physics!
MCC Crew Chief Schoene
MCC Operators Barker, Mock, Samari, Shenenberger
Program Deputy Sereno
Announcements

Access Status

Recent PSS History

recent pss history graph