Autolog save
0 degree ILD set up finalized
0 degree in line dump set up finalized with 90 uA CW C laser. Figs 1-3 are transmission and orbit relative to 46.5 degree set up. Fig 4+5 is orbit and transmission of B laser. Figs 6+7 are Orbit and transmission with D laser. All Save #27257
Autolog save
MDJ0L10V mismatch
The following cavity histories have been updated: 1L09-3
The following cavity histories have been updated: 1L09-6
90 uA to ILD 46.5 degree Wien
Had to do some light steering, but otherwise no issue making it to ILD at high current (90 uA with 99% transmission)
Fig 1 and 2 is C beam orbit after touch ups compared to rels.
Fig 3 is transmission 90 uA C beam
Fig 4 is B beam compared to C laser zero pos
Fig 5 is B transmission at 20 uA
Fig 6 is D beam relative to C laser zero pos
fig 7 is D beam transmission at 20 uA
All save #27256
Autolog save
Autolog restore
Autolog save
MAT0R06V mismatch; card reseated
QuickPic - returned A1 to 4mm
Autolog restore
"beginning High energy ILD set up finalization"
Autolog save
"MOLLER studies finished"
Operator SIGN IN
Recovered 1L11-7 To Previous ODVH (8.0->11.8, +3.8 MV/m)
The OPS DRVHs for the following cavities have been updated: 1L11-7
The OPS DRVHs for the following cavities have been updated:
1L11-7
Username: deir
Date/Time: 06-03-26_23:55:18
RF Status: Good
Tuner Status: Good
Comment: DRVH=11.800 Stable here. GASK/GASKR, CRFP, WGVac look good.
Previous OPS DRVH: 8
Special Instructions: