COMMENT ON Add (2) Magnet Pairs in Series on the 5D Line in the Injector MHB5D01H/V and MHB5D01AH/AV
2L22-4 Cold Window Faults. Derated 0.5 MV/m
Downtime Incident CLOSED: Aluminum Waterflow Alarm
"Beam off to halls for injector setup"
FSD Masking Tool: Successful Destination masking to: Injector ***Some node's masks failed to write
FSD Masking Tool: Successful Destination masking to: Inj5MeV ***Some node's masks failed to write
QuickPic - Hall A Radcon Checklist
Hall D Aluminum Water flow not alarming with a negative readback
COMMENT ON MPS system maintenance and repairs during run 2025
For the upcoming maintenance day we would like to repair some damaged power and signal cables in the North Linac for the BLM's. This would require access to the NL if possible.
We will also install the HV supply to FSD system interface box that we removed earlier for repairs (reference log #4356378.) and has been running on our test stand for 3 weeks with know errors.
COMMENT ON PSS maintenance and troubleshooting 2025 run
Downtime Incident CREATED: Aluminum Waterflow Alarm
Precedence for Negative Flow
Negative Flow on Aluminum Skid
Just after given the all clear, we're seeing the aluminum water flow went negative? We're unsure as to the physicality of this readback so we're contacting I&C
The alarm goes when the readback hits zero, but does not latch once it moves negatively, which is concerning.
COMPLETED Tagger aluminum skid pump not running.
Tagger Aluminum Skid Pump Fixed
Downtime Incident CLOSED: Hall D beam dump
APPROVED Tagger aluminum skid pump not running.
13 Second Injector Oscillation Investigation
Using 1 minute's worth of BPM data in each arc when we were running micro amp current 5th pass (see Fig 1) with the corresponding FOpt's dispersion data, I was able to calculate the change in momentum given the 15 second oscillations peak energy variation at the 80 second interval.