Program Information

Recent Beam Current to Halls

recent beam current graph

Recent Log Entries

  • HYST AREA 7-0 Cycles Magnets for eDT
  • NL gradient distribution
  • eDT V2-40-4 Design Setpoints Download - 2C triplet quads set to design for optics tuning
  • 1L08 regulation issues
  • Program Deputy Summary, presented 2026-04-07
  • APPROVED Install a scab transformer in 2L03
  • "MXV4T04 Shunt Module Swap is underway"
  • Operator SIGN IN
  • Operator SIGN IN
  • COMMENT ON Replace Shunt Module MXV4T04
  • APPROVED Replace Shunt Module MXV4T04
  • MXV4T04 mismatches
  • eDT V2-40-4 Design Setpoints Download
  • APPROVED B38 (S. Access) Replace bad EXIT light fixture room 108.
  • CREW CHIEF SIGN IN
More

Shift Information

Shift Day
CEBAF Program
MCC Crew Chief Schoene
MCC Operators Barker, Thomas
Program Deputy Malace