Recent Log Entries
COMMENT ON *Accelerator Viewer maintenance
CREW CHIEF SIGN IN
THOMAS JEFFERSON NATIONAL ACCELERATOR FACILITY
ACCELERATOR OPERATIONS CREW CHIEF SIGN IN FORM
Date : 01-05-23
Time : 07:12:10
Day : Thursday
Shift : Day
Crew Chief : Humphry
Program Deputy: Spata
Team : X
Arm : RadCon
Designated SSO: Christian
LERF Operator:
Operators : Christian
This stamp certifies that the above Crew Chief has read/reviewed/received the following:
APPROVED MPS BLM replacement in 1L12 and 2L08
Hall A Laser PMES Unstable
EGG took a look at it on swing shift and gave the okay to adjust alarm limits, ~21:00.
GMES has been going up and down ever since. Slightly adjusted the LOLO to keep it from alarming.
Fig 3&4: Looks like it could be related to phase fluctuations.
Operator SIGN IN
Injector work summary
Autolog save
Hall A Laser GMES Has Risen
INJECTOR=>RF=>0L02=>0L02-8=>R028PMES (PHASE MEAS) has been disabled in alarm handler
INJECTOR=>RF=>0L02=>0L02-7=>R027PMES (PHASE MEAS) has been disabled in alarm handler
Injector Alarm Limits Set
Autolog save
COMMENT ON ARC3 PS Mains High Power Testing Into Resistive Load and Commissioning
Mark and I ran repaired ARC3 power supply on a resistive load (2.33 Ohms) today up to 450A. Looking at the diagnostic waveform on NSH side @ 300A and 450A we see that the current sharing among all four NSH4 sections aren't equal rather NSH3 is running around 10% higher than rest of them. Please note NSH3 converter section is where we replaced the bad choke last year.
Tomorrow we will look into the PWM board because if the reference triangular voltage is higher then it will drive the IGBT harder and run higher current depending on the percentage off.
P.S.