Recent Log Entries
iocse16 restored
iocsoftserptn05 restored
COMMENT ON PERIODIC INSPECTION OF ACCELERATOR STAND TORQUE AND MAGNET POSITION VERIFICATION
COMMENT ON Re-connect/Install West ARC Beamline
COMMENT ON Spring SAD 2023 RF Work Tracking
CANCELLED Install lead brick shielding for view in NL
iocsoftinspcevdp restoration failed
iocsoftgunspce restoration failed
iocin04rfint restored
iocse15 restored
COMMENT ON Injector Phase II - Viewer and Harp installation
ITV0L01 - YAG Crytals install and bellows swap complete
Lognumber 4158823. Submitted by delacruz on Wed, 05/24/2023 - 11:02.
Logbooks: BDLOG ELOG INCLOG
Removed the viewer assembly from the 0L01 girder assembly in the SRF Clean room. Disassembled the viewer, replaced bellows gasket and hardware. Set the orientation of the target facing 45 degrees upstream up beam direction. Mounted the YAG crystal. Re-installed viewer assembly, clocked the assembly in the correct orientation. Inserted viewer, adjusted the turn buckle to center the YAG target. Tightened down the fasteners on the turnbuckle.
ITV0L01 - YAG Crytals install and bellows swap complete
Removed the viewer assembly from the 0L01 girder assembly in the SRF Clean room. Disassembled the viewer, replaced bellows gasket and hardware. Set the orientation of the target facing 45 degrees upstream up beam direction. Mounted the YAG crystal. Re-installed viewer assembly, clocked the assembly in the correct orientation. Inserted viewer, adjusted the turn buckle to center the YAG target. Tightened down the fasteners on the turnbuckle. Assembly, installation, and check out is complete. Thanks to Tayshaun and Danny F. for the assistance.