Recent Log Entries

FSD Masking Tool: Successful System Masking for: BeamLossMonitor

Log Number: 3819077Logbook(s): Tags: Body: System Masking for: BeamLossMonitor
User: eforman
Areas: All

BeamLossMonitor Devices:
ILM0I07
ILM0L01A
ILM0L01B
ILM0L02
ILM2D00A
ILM2D00B
ILM0L04A
ILM0L04B
ILM0L05
ILM0L06A
ILM0L08
ILM0R01
ILM4D00
ILM0R03
ILM0R04
ILM0R06
ILM0R08
ILM0R09
ILM1L01
ILM1L02
ILM6R08
ILM3S00
ILM7S00
ILM9S00
ILM5S10
ILM5E03
ILM7S01
ILM9A01
ILM3E02
ILM5A01
ILM1A04
ILM1A06
ILM3R10
ILM9R07
ILM1R09
ILM2L03
ILM5R10
ILM5R05
ILM2L01
ILM2T09
ILM8T09
ILM4C01
ILM4C02
ILM4C03
ILM1C0

RF Module Downloads

Log Number: 3819069Logbook(s): Body: COMMENTS: changed control module


The following module files were successfully downloaded
in034e

Operator SIGN IN

Log Number: 3819068Logbook(s): Body:  ACCELERATOR OPERATOR SIGN IN FORM OPERATOR:    Forman
DATE:             08/01/2020
SHIFT:               Swing

The operator has read the following:
  • ELOG
  • PD Shift Plan
  • Radiation Surveys for PSS Segments in Controlled Access
  • PSS Log

RF Module Downloads

Log Number: 3819067Logbook(s): Body: COMMENTS: changed control module


The following module files were successfully downloaded
in034d

0L03-4 Status Update

Log Number: 3819065Logbook(s): Entry Makers: aikenBody: 

2.5W amp replaced. Able to get power out of it, but still unstable detune angle. Changing control module now.

HYST AREA 6-2-1 Cycles Magnets

Log Number: 3819041Logbook(s): Body: 

HYST AREA Version 6-2-1 has successfully cycled the following:

Area.Arcs.Arc1.Spreader
Area.Arcs.Arc1.Arc
Area.Arcs.Arc1.Recombiner
Area.Arcs.Arc1.Extraction
Area.Arcs.Arc3.Spreader
Area.Arcs.Arc3.Arc
Area.Arcs.Arc3.Recombiner
Area.Arcs.Arc3.Extraction
Area.Arcs.Arc5.Spreader
Area.Arcs.Arc5.Arc
Area.Arcs.Arc5.Recombiner
Area.Arcs.Arc5.Extraction
Area.Arcs.Arc7.Spreader
Area.Arcs.Arc7.Arc
Area.Arcs.Arc7.Recombiner
Area.Arcs.Arc7.Extraction
Area.Arcs.Arc9.Spreader
Area.Arcs.Arc9.Arc

Box Supplies Were Cycled

Log Number: 3819038Logbook(s): Tags: Body: 

The following box supplies were CYCLED by version 2-7 of the Box Supply Cycling Script:
ARC1A Ramp Rate = 8.113 A/s
ARC3A Ramp Rate = 9.832 A/s
ARC5A Ramp Rate = 10.160 A/s
ARC7A Ramp Rate = 10.471 A/s
ARC9A Ramp Rate = 8.955 A/s
RSEP9A Ramp Rate = 9.319 A/s

Box Supplies Were Cycled

Log Number: 3819031Logbook(s): Tags: Body: 

The following box supplies were CYCLED by version 2-7 of the Box Supply Cycling Script:
RSEP9A Ramp Rate = 9.319 A/s

building temps

Log Number: 3819028Logbook(s): Entry Makers: beneschBody: 

Not bad where the even R shunt racks are, near start of NL SB.